1 / 9

CEA R4.3 WG 1

CEA R4.3 WG 1. Organized under CEA R4.3 Television Data Systems Subcommittee Responsible for Digital Closed Caption Standards EIA-708-B CEB-8. Tasks. Task Group 1: Test Streams for DTV-CC Task Group 2: EIA-708-B Implementation Task Group 3: Standards Maintenance. Test Streams.

Download Presentation

CEA R4.3 WG 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CEA R4.3 WG 1 • Organized under CEA R4.3 Television Data Systems Subcommittee • Responsible for Digital Closed Caption Standards • EIA-708-B • CEB-8

  2. Tasks • Task Group 1: Test Streams for DTV-CC • Task Group 2: EIA-708-B Implementation • Task Group 3: Standards Maintenance

  3. Test Streams • A Brief explanation of our work

  4. Requirements • Base-band video • Initially, 1080i, then 720p and so on. • Video Graphics • Standard Test Pattern • Printed Time Stamp • Descriptive Open Caption Box (WYSIWYSG) • Include Identification Title

  5. Requirements • PSIP • Use Service Descriptors • Stuff EIT and ETT • Support 6 Services • Emphasis on Conformance • Test 128k byte buffer limit • Boundary Testing

  6. Requirements • Distribution • CD-ROM • 4 Minutes and 20 second limit • Suite of Test Disks

  7. Iteration 1 • Complete EIA-608 • CC1 and CC3 • Transcoded to EIA-708 • Service 1 and 2

  8. Iteration 2 • Native EIA-708 • Service 1 through 6 • Prioritized Features Testing • Boundary Testing

  9. End Thank You

More Related