An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMM++ firmware development Samuel Silverstein Stockholm University • Backplane formats (update) • CMM++ firmware

  2. CMM++ firmware • Questions: • How much work to produce initial firmware for the CMM++? • Can a "Day-1" compatible CMM++ be implemented in the target Virtex-6? • Implications for CMM++ hardware? • Idea: Adapt "Day-1" Jet CMM f/w to Virtex-6 • Existing VHDL with minimal changes • Same development environment (Mentor/ISE) • Set realistic user constraints (UCF)

  3. CMM++ concept (Yuri) VME-- Glink Legacy DAQ and ROI readout Glink Input from JEM/CPM 12-fiber bundles, 6.4/10 Gbit/s/fiber Tx and/or Rx SNAP12 Virtex 6 HX565T LVDS merger links SNAP12 SNAP12 Not a complete picture! SNAP12 Legacy LVDS outputs to CTP SNAP12 Input from JEM/CPM modules (160 MHz) SNAP12 3

  4. The current CMM VME-- VME CPLD Glink DAQ and ROI readout TTCrx Glink Input from JEM/CPM LVDS merger links Virtex E (crate) Virtex E (system) Input from JEM/CPM modules (40 MHz) LVDS outputs to CTP 4

  5. "Day-1" firmware, first try: VME-- VME CPLD Glink DAQ and ROI readout TTCrx Glink Input from JEM/CPM Implement in Virtex 6 (XC6VHX565T-2FF1924) from existing VHDL LVDS merger links Virtex E (crate) Virtex E (system) Input from JEM/CPM modules (40 MHz) LVDS outputs to CTP 5

  6. Firmware is easy to port • Top-level VHDL design, containing both crate and system FPGAs plus interconnects (done) • Most of code pure VHDL, ports transparently • Two architecture-specific changes • Block RAMs 4k  18k or 36k (Done 1  1) • Clocking: DLLs  MMCM • Advanced mixed-mode clock manager (Done) • Note: UNISIM libraries for Mentor compatibility

  7. Results from first attempt • Note: numbers come from Precision, not ISE • Take as an early, rough estimate • Plenty of resources left in FPGA • Logic slices: about 2% used • Registers: about 2% used • Block RAM: about 5% • Can be reduced by at least 1/2 by more efficient use of 18kb and 36 kb memories. • Significantly faster than Virtex-E • Max. frequency more than 120 MHz without trying • Can save several ticks of latency • I/O requirements very close to limit...

  8. I/O budget for V6HXT565 • Available I/O (not including transceivers): 640 pins • Real-time data path: • Backplane input (16 x 25): 400 • Cables (3 x 25): +75 • CTP output (2 x 33): +66 = 541 pins • Control and timing: • VME-- from CPLD 35 • TTC (L1A, BCR, deskew 1 and 2) +4 • Crystal clock +1 • clr_pe,rst,rst_dll,pbk_en,can_mc,en_cblout +6 = 46 pins • Readout: • Glink data outputs 2 x 20 40 • DAV pins 2 = 42 pins • Indicator LEDs : 8 + 8 pins • TOTAL: 637 / 640637 • This is after removing spare TTL and test ports.

  9. 637/640 is too many • I/O banks include multi-function pins: • VREF • Global clock inputs • So we can't use all of the pins just for I/O

  10. Can we save I/O? • Available I/O (not including transceivers): 640 pins • Real-time data path: • Backplane input (16 x 25): 400 • Cables (3 x 25): +75 • CTP output (2 x 33): +66 = 541 pins • Control and timing: • VME-- from CPLD 35 • TTC (L1A, BCR, deskew 1 and 2) +4 • Crystal clock +1 • clr_pe,rst,rst_dll,pbk_en,can_mc,en_cblout +6 = 46 pins • Readout: • Glink data outputs 2 x 20 40 • DAV pins 2 = 42 pins • Indicator LEDs : 8 + 8 pins • TOTAL: 637 / 640 637. • <600 Move to FPGA from CPLD Implement Glink in Virtex 6?

  11. Glink in Virtex 6: • Glink emulation already done in other FPGAs • Altera provided code for Stratix GL • Has been ported to Xilinx FPGAs • Virtex 4, Virtex 5 • L1Muon collaborators at INFN most recently ported to Virtex 5, with both simple and enhanced modes • Shared code, documentation to me • Seems straightforward to adapt to Virtex 6

  12. "Day-1" firmware, next try: VME-- VME CPLD Glink DAQ and ROI readout TTCrx Glink Input from JEM/CPM LVDS merger links Virtex E (crate) Virtex E (system) Input from JEM/CPM modules (40 MHz) LVDS outputs to CTP 12

  13. Next steps... • Add Glink functionality in two GTX tx • Produce "realistic" user constraint file (UCF) • All I/Os arranged in appropriate banks • Correct signal levels for backplane, cables, CTP, etc... • Differential global clock inputs • etc... • Implement in ISE to check actual resource use, clock speed • Simulate to verify correct behavior

  14. Looking even further("stage 2") • Add block for receiving and distributing 160 MHz backplane signals • Add multi-Gbit tranceivers to serialize and send out backplane data over fibers • Do similar for non-system-merging CMM++

  15. CMM++ "stage 2" VME-- Glink I N P U T Input from JEM/CPM Glink 8b/10b ser LVDS merger links SNAP12 Crate SYS to CTP Input from JEM/CPM modules (160 MHz) 15

  16. Backplane formats CPM: JEM:

  17. Thoughts / conclusions • Straightforward to port existing CMM VHDL code to Virtex 6 • FPGA-specific elements using Unisim • I/O is a limiting factor, seems to point towards a favored architecture • External CPLD for VME interface • G-link readout emulated with GTX transmitters • Early CMM++ staging possible by adding more components to "Day-1" design • Don't need to start each new stage from scratch! • No show stoppers so far!