AGARTALA MUNICIPAL CORPORATION Energy Efficient Street Lighting System Project by EESL In Agartala City
Introduction • Memorandum of Understanding (MoU) between Agartala Municipal Corporation (AMC) Energy Efficiency Services Limited(A JV company of PSUs of Ministry of Power, Government of India) signed on 9th December 2014 to replace 32216 conventional lights with LED street lights. • EESL to install, operate & maintain these LED street lights over 10 years. • Entire capital cost by EESL, repayment of the capital cost will be made through the savings on energy bills LED Streetlight Pilot Project being inaugurated by Hon’ble Power Minister/UD (Govt. of Tripura) on 8th January, 2015
Benefits to AMC • Annual Energy Savings = 5.40 Million Units • Annual Cost Savings = Rs. 3.77 Crores • Annual Maintenance Savings = Rs. 0.32 Crores • Total Annual Savings = Rs. 4.08 Crores • EESL Annuity = Rs. 5.18 Crores -------------------------------------------------------------
Project Implementation • 31640 Lights replaced in 60 days from the date of placement of LOI to manufacturers. • Balance 576 Lights will be completed by 30th June 2015 • Centrally Controlled Monitoring System (CCMS) to be installed by 15th August, 2015
AFTER BEFORE Power Factor: 0.42 Lux Level: 17.6 lux Power Factor: 0.96 Lux Level: 28.9 lux NEAR DAINIK SAMBAD , VIP ROAD
Power Factor: 0.98 Lux Level: 32.3 lux IN FRONT OF RAJBHAVAN
Power Factor: 0.96 Lux Level: 27 lux NEAR BHOLA GIRI ASHRAM