1 / 3

FR Optional Hg Methods Rulemaking 09/07/07: Method 30A

FR Optional Hg Methods Rulemaking 09/07/07: Method 30A. Method 30A begins page 51501 Determines total vapor phase Hg Full traversing req’d – unless (see 8.1.3) Section 8.1.3 “Stratification” see 8.1.3.5 sub. SO 2 until 01/01/09 (page 51504)

snowy
Download Presentation

FR Optional Hg Methods Rulemaking 09/07/07: Method 30A

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FR Optional Hg Methods Rulemaking 09/07/07: Method 30A • Method 30A begins page 51501 • Determines total vapor phase Hg • Full traversing req’d – unless (see 8.1.3) • Section 8.1.3 “Stratification” see 8.1.3.5 sub. SO2 until 01/01/09 (page 51504) • Section 8.2.7 “Dynamic Spiking” waived until 01/01/09 (page 51505) • QA/QC summary table page 51507

  2. FR Optional Hg Methods Rulemaking 09/07/07: Method 30B • Method 30B begins page 51518 • Intended for total vapor phase Hg • Traversing req’d – extent as per 30A • QA/QC summary table page 51522

  3. FR Optional Hg Methods Rulemaking 09/07/07: Other Included Items • Part 72 Permits Regulation - revision of sorbent trap monitoring system definition - page 51527 • Part 75 Continuous Emission Monitoring – various revisions and additions beginning on page 51527, including to Appendix K

More Related