FR Optional Hg Methods Rulemaking 09/07/07: Method 30A. Method 30A begins page 51501 Determines total vapor phase Hg Full traversing req’d – unless (see 8.1.3) Section 8.1.3 “Stratification” see 8.1.3.5 sub. SO 2 until 01/01/09 (page 51504)
E N D
FR Optional Hg Methods Rulemaking 09/07/07: Method 30A • Method 30A begins page 51501 • Determines total vapor phase Hg • Full traversing req’d – unless (see 8.1.3) • Section 8.1.3 “Stratification” see 8.1.3.5 sub. SO2 until 01/01/09 (page 51504) • Section 8.2.7 “Dynamic Spiking” waived until 01/01/09 (page 51505) • QA/QC summary table page 51507
FR Optional Hg Methods Rulemaking 09/07/07: Method 30B • Method 30B begins page 51518 • Intended for total vapor phase Hg • Traversing req’d – extent as per 30A • QA/QC summary table page 51522
FR Optional Hg Methods Rulemaking 09/07/07: Other Included Items • Part 72 Permits Regulation - revision of sorbent trap monitoring system definition - page 51527 • Part 75 Continuous Emission Monitoring – various revisions and additions beginning on page 51527, including to Appendix K