Building a new community hub at the Old Natwest building in the centre of Chipping Norton is starting to feel very real now! A mobile drilling rig was brought in to drill two boreholes to establish the underlying geology in the basement where we are lowering the floor to achieve consistent level floors from front to back. There were a few challenges along the way. Read more about the design proposals in our blog.

Download Presentation

Basement Geology | SOLID Structures & Infrastructure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BASEMENT GEOLOGY Building a new community hub at the Old Natwest building in the center of Chipping Norton is starting to feel very real now!

  2. UNDERLYING GEOLOGY IN THE BASEMENT Building a new community hub at the Old Natwest building in the center of Chipping Norton is starting to feel very real now! A mobile drilling rig was brought in to drill two boreholes to establish the underlying geology in the basement where we are lowering the floor to achieve consistent level floors from front to back. There were a few challenges along the way.

  3. PROPOSED SOLUTION Getting the 600kg rig into position in the basement with no rear access meant we had to plan a route through the front door, open up a back wall, build a temporary ramp down to the garden at basement level and open up a hole in the timber floor over, to enable the rig to be stood upright. Hours of careful planning came to fruition when the rig was successfully maneuvered along the tortuous route and into position.

  4. GROUND INVESTIGATIONS 8M DEEP BOREHOLES The ground investigations will include two 8m deep boreholes with in situ sampling and testing to determine ground conditions within the basement floor. Five additional trial holes will be dug by hand to a depth of 1.8m to investigate the level of the bedrock clay. Laboratory soil tests will be carried out to classify the shrinkage potential of the shallow soils.

  5. READ MORE ABOUT THE DESIGN PROPOSALS IN OUR BLOG. Website www.solid-engineering.co.uk Twitter @SolidStructures Instagram solid.engineering