20% Wind Vision

20% Wind Vision. NARUC Electricity Committee February 19, 2008 Rob Gramlich Policy Director rgramlich@awea.org. Existing 765 kV New 765 kV AC-DC-AC Link. Transmission for 20% Electricity From Wind. 140 Control Areas Today. From 2003 DOE-NRCan Blackout Report.

sonya-foley
Download Presentation

20% Wind Vision

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 20% Wind Vision NARUC Electricity Committee February 19, 2008 Rob Gramlich Policy Director rgramlich@awea.org

  2. Existing 765 kV New 765 kV AC-DC-AC Link Transmission for 20% Electricity From Wind

  3. 140 Control Areas Today From 2003 DOE-NRCan Blackout Report