ISO Requirements and impact on OpenADR EI TC 8/19/2009 Agenda Item 6

ISO Requirements and impact on OpenADR EI TC 8/19/2009 Agenda Item 6. Ed Cazalet. ISO Views on Smart Grid: CAISO. They advocate both Deep situational awareness of transmission and distribution grid to support centralized dispatch, and

sophie
Download Presentation

ISO Requirements and impact on OpenADR EI TC 8/19/2009 Agenda Item 6

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO Requirements and impact on OpenADREI TC 8/19/2009 Agenda Item 6 Ed Cazalet

  2. ISO Views on Smart Grid: CAISO • They advocate both • Deep situational awareness of transmission and distribution grid to support centralized dispatch, and • Decentralized dispatch of storage, EV, PHEV, DER, DR via tariffs (dynamic pricing) • Source: May 11, 2009 CAISO comments to FERC on smart grid policy

  3. ISO/RTO Markets • Day-ahead hourly & real-time 5 min markets. • Participants Submit bids ( orders) with price and amount. • DA and RT auctions determines transactions and marginal prices at 1000’s of points of delivery (locations) – locational marginal pricing (LMP) • Schedules for generation and load determined from transactions • Actual meter readings are used to adjust final billing and settlement for deviations from schedules. • Forward markets for capacity including DR curtailment in some ISO/RTOs.

  4. IRC DR Timing Examples

  5. Metering & Validation (M&V) • DR – basis is usually estimated based on history. • Curtailment is relative to this basis. • Meter reads can verify response. • Dynamic Forward Pricing & Transactions • Positions determined by contracted amounts • Meter reads vs. final position can be settled at ex-post real-time prices w/wo penalty.

  6. DNP3 : Distributed Network Protocol • Used for substation, some generators, large loads, and aggregator communication • www.dnp.orgThe development of DNP3 was a comprehensive effort to achieve open, standards-based Interoperability between substation computers, RTUs, IEDs (Intelligent Electronic Devices) and master stations (except inter-master station communications) for the electric utility industry. • Membership required to see protocol. • Discussions ongoing regarding migration / melding of DNP3 and IEC 61850