1 / 15

Responsibilities & Planning

Responsibilities & Planning. DCS WS 28.2.05 L.Jirdén. 3. Services. ECS. 4. External Systems. power. cooling. gas. LHC. magnets. DAQ. Ctrl. infrastructure. Trigger. Ctrl. safety. HLT. Ctrl. access. Controls Context. 1. Back-end. DCS. ITS. TPC. MUON. pixel. strip. drift.

Download Presentation

Responsibilities & Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Responsibilities & Planning DCS WS 28.2.05 L.Jirdén

  2. 3. Services ECS 4. ExternalSystems power cooling gas LHC magnets DAQ Ctrl infrastructure Trigger Ctrl safety HLT Ctrl access Controls Context 1. Back-end DCS ITS TPC MUON pixel strip drift T T p hv hv hv hv hv lv lv lv lv lv 2. Detectors

  3. Responsibilities • ACC (and its CERN partners) to provide • DCS H/W Infrastructure • Back-End System • Common Services • Interface to TRG, DAQ, HLT, LHC via ECS • S/W Infrastructure for Detector Applications • Detectors to provide • Detector Sub-System Devices and Cabling • Detector Specific Networking (Ethernet switches) • Detector Applications for each Sub-System • Detector Specific Services • Integration of all Detector Sub-Systems to a full Detector Control System • Interface to the Alice Detector Control System layer

  4. ACC to provide:DCS H/W infrastructure • DCS Racks • 8 racks in CR3 equipped with Electricity and Cooling • Network • DCS network to all places where DCS computers and devices are located: detectors to specify requirements! • Firewalls and DCS Network Access • Computers • Back-end • Front-end: detectors to specify requirements! • PCI interfaces: detectors to specify requirements! • Peripherals • Printers, displays, etc

  5. TPC(1) 108? B-END DATABASESERVER 1er DOMAIN CONTROLLER 2nd DOMAIN CONTROLLER APPLICATION GATEWAY COMP INFRA-STR. NODE FILE SERVER ? 2 ? 22 216 1 18? 3 1..18 1..22 1..3 288 ~400? ? 1? 1 1 108 ? 26/11/04 [FSM?] Database(s) PVSS II PVSS II PVSS II Control room (ACR) OPCclient DIMclient User interface Back-End Ethernet PVSS II PVSS II PVSS II PVSS II PVSS II OPC client OPC client OPC client OPC client PVSS II ISEG OPCserver Wiener OPCserver ELMB OPCserver ELMB OPCserver DIMclient PCI-CAN PCI-CAN PCI-CAN PCI-CAN RS232 C C C C E S Front-End [FED] DIMsrv DIMcl ISEG Heinzinger Eth. Switch E Wiener Eth. Switch E HV LV ELMB HV ELMB LV monitor DDL Chambers Chambers Chambers,detector RCU HVrod HVrod DIMsrv High Voltage Low Voltage Temp. Monitor FEE Very High Voltage VHV Curr. Monitor

  6. ACC to provide COMMON SERVICES ECS INTERFACE TO ECS electricity cooling gas LHC DCS magnets DAQ Ctrl infrastructure Trigger Ctrl safety HLT Ctrl access ITS TPC MUON pixel strip drift T T p hv hv hv hv hv lv lv lv lv lv

  7. TPC(2) 1 1 40 216 18 ? 72 ? 4 ? 2? 26/11/04 Cooling & Gas Control Ethernet [GWG] PVSS II PVSS II DIMserver (?) OPCserver (?) Modbus/TCP Modbus/TCP ? PCI-Profibus P E E [TS/CV] PLC TS/CVSCADA Calibrationpulser PLC PLC C PS Laser P ELMB Gas Gatingpulser CoolingPlant (ch) CoolingPlant (TS) Mirrors,cameras Chambers Chambers,detector HVrod ThermalScreen(s) Detector Laser calibr. syst. Pulser system Chamber Cooling VHV rod Cooling Thermal Screen(s) Gas system

  8. TPC(1) 108? F-END WXP/Linux PVSS II FW OPCserver LIBRARIES PCI 2 1 ? 216 3 22 18? ? 1..22 108 288 1..3 1..18 ? ? 1 1 ~400? 1? 26/11/04 [FSM?] Database(s) ACC TO PROVIDE: SOFTWARE INFRASTRUCTURE FOR F-END’s PVSS II PVSS II PVSS II Control room (ACR) OPCclient DIMclient User interface Ethernet PVSS II PVSS II PVSS II PVSS II PVSS II OPC client OPC client OPC client OPC client PVSS II ISEG OPCserver Wiener OPCserver ELMB OPCserver ELMB OPCserver DIMclient PCI-CAN PCI-CAN PCI-CAN PCI-CAN RS232 C C C C E S Front-End [FED] DIMsrv DIMcl ISEG Heinzinger Eth. Switch E OPC client Wiener Eth. Switch E HV LV ELMB HV ELMB LV monitor DDL Chambers Chambers Chambers,detector RCU HVrod HVrod DIMsrv High Voltage Low Voltage Temp. Monitor FEE Very High Voltage VHV Curr. Monitor

  9. TPC(1) 108? 216 ? ? 3 2 22 18? 1 1? 288 1..22 ? 1 ~400? 1..3 1 ? 1..18 108 26/11/04 [FSM?] Database(s) DETECTORS to provide* SUB-SYSTEM DEVICES, CABLES* ELMB provided by ACC* SPECIFIC NETWORKING* DETECTOR SPECIFIC SERVICES (GAS, COOLING) PVSS II PVSS II PVSS II Control room (ACR) OPCclient DIMclient User interface Ethernet PVSS II PVSS II PVSS II PVSS II PVSS II OPC client OPC client OPC client OPC client PVSS II ISEG OPCserver Wiener OPCserver ELMB OPCserver ELMB OPCserver DIMclient PCI-CAN PCI-CAN PCI-CAN PCI-CAN RS232 C C C C E S [FED] DIMsrv DIMcl ISEG Heinzinger Eth. Switch E Wiener Eth. Switch E HV LV ELMB HV ELMB LV monitor DDL Chambers Chambers Chambers,detector RCU HVrod HVrod DIMsrv High Voltage Low Voltage Temp. Monitor FEE Very High Voltage VHV Curr. Monitor

  10. DETECTORS DETECTOR APPLICATIONS ACC ALICE STANDARDS JCOP FRAMEWORK PVSS TOOLS ALARM ARCHIVAL CONDITION ARCHIVAL FW CORE CONFIGURAT PVSS CONFIG FEE CONFIG DEVICE COMPONENTS ACCESS APPLICATIONS TRENDING CONNECTION: OPC, DIM, DIP DETECTORS To provide: APPLICATIONS

  11. DETECTORS To provide * Integration of subsystems* Interface to DCS ECS DCS … … gas power Control Units … racks det D det E det B … sub-sys 1 sub-sys 2 sub-sys 1 sub-sys 2 Device Units … … device a device b device e To physical devices

  12. Jan 06 Aug 06 Mar 2007 April 2007 Nov 05 PHASE 1 PHASE 2 PHASE 3 PHASE 4 INFRASTRUCTURE TPC HMPID Pre-Installation HMPID TOF / TRD PHOS TPC/ITS VacuumFMD/V0/T0 RB26 FMD/V0/T0 RB24 PMD Stage2VacuumL3 doorsShielding Final Installation Muon spectrometer Installation schedule

  13. DCS: RACKS NETWORK DSS B-END GCS TPC F-END ECS HMPID F-END Pre-installation planning Jul 06 May 05 April 05 Jan 06 Feb 06 Aug 05 Nov 05 Jan 05 PRE-INSTALLATION TPC CHAMBER MOUNT TPC FEE TPC COMMISSIONING

  14. Plans for 2005 SXL2 SX2 SG F-END TPC GAS DSS F-end comp TPC TPC GAS SYSTEM DSS MAY 05 MAY 05 OCT 05 F-END CR3 B-END F-end comp B-end comp HMPID AUG 05 OCT 05 CR4 DSS DSS MAY 05 • TPC and HMPID Pre-installation at P2 NETWORK MARCH 05

  15. Detector groups: DETECTOR APPLICATIONS SOFTWARE Central Team: INSTALLATION AND VALIDATION TEST GUIDE REQ B-END PURCH F-END:HMPIDTOFTRDPHOSMTGMTK F-END:TPCITSFMD/V0/T0PMD Installation schedule Jan 05 Jan 06 Aug 06 Mar 2007 April 2007 PHASE 1 PHASE 2 PHASE 3 PHASE 4 HMPID TOF / TRD PHOS TPC/ITS VacuumFMD/V0/T0 RB26 FMD/V0/T0 RB24 PMD Stage2VacuumL3 doorsShielding Muon spectrometer

More Related