IntelliTraffic Group 7 - Progress Review. Project supervisor: Dr. Chatura De Silva . Group members: Dharmawardana K.A.T.S Rathnayake A.D.S.E. Rodrigo S.A.K.C. Sandeepani L.A.A. Outline. Feasibility study Literature survey Requirement gathering Technologies Risk analysis
E N D
IntelliTrafficGroup 7 - Progress Review Project supervisor: Dr. Chatura De Silva Group members: Dharmawardana K.A.T.S Rathnayake A.D.S.E. Rodrigo S.A.K.C. Sandeepani L.A.A.
Outline Feasibility study Literature survey Requirement gathering Technologies Risk analysis How we are going to continue…
Feasibility Study When we came up with the idea… Highly enthusiastic Had a hesitation, weather it would be feasible Motivations and uncertainties Feasibility was discussed with relevant experts in the field We were encouraged System will be beneficial to the public
Literature Survey Existing system, UNIROAD 1, was studied Microcontroller chip has to be replaced to change the signal timing/patterns. System being developed, UNIROAD 2, was studied Still at prototype level Configurability and flexibility is high
Literature Survey Other existing systems in the world Autoscope [http://www.autoscope.com] http://www.novosoft-us.com Intelligent Traffic Control System – Ontario, Canada Many more…
Literature Survey Theories on traffic control were studied Presentation slides by Prof. Saman Bandara Research papers http://www.geog.buffalo.edu/~jcthill/UGSection12.pdf http://www.trafficlab.utah.edu Having no IEEE registration was an issue
Requirement Gathering Sources of requirements Discussions with Dr. Chatura De. Silva Discussions with Mr. Shantha Fernando Appointment with Prof. Saman Bandara Studies done on existing systems Analysed and summarised those ideas
Technologies Image processing Computer vision Matlab Ideal for developing prototypes Cost of change is low C++ More powerful and fast
Risk Analysis Project has a fairly large scope Challenges To develop a computer vision based system that will function properly under any weather condition Ambiguities about theories Difficult to clarify all the ambiguities Implementation must be started based on assumptions
How We Are Going to Continue… Identified two main phases in the project Identification and classification of traffic flow Analysis of parameters and scheduling signal lights to optimize traffic flow Two of us will work on each phase independently