An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Paint Product Stewardship Initiative NAHMMA Conference September 22, 2005Tacoma, WA Scott Cassel, PSI Executive Director

  2. $16-35 mil. $8 23% 50% Estimated # of gallons leftover in U.S. annually Estimated average cost/gallon to manage Increase in CA paint collection 2001-2003 Drop in recycled content paint purchase by CA state agencies between 2001-2004 Wake Up Call! This is not sustainable!! What Do These Numbers Mean to Paint Management In the U.S.?

  3. Product Stewardship Institute • Non-Profit Founded in December 2000 • Based in Boston, MA • Coalition Members • Agency leaders pledge to work with PSI on product stewardship issues • 31 State members • 28 Local agency members

  4. Let’s Look at thePaint Dialogue Process… • Research (10/02 – 9/03) – 1 year • Technical Research Document • Paint Stewardship Action Plan • Dialogue (12/03 – 9/04) – 9 months • 4 meetings • Numerous workgroup conference calls • Project Implementation (4/05 – 10/06) – 18 months • Designing a nationally coordinated paint management system (10/06-4/07)

  5. PSI Role in Paint Dialogue • Facilitate/mediate the dialogue • Provide technical research and analysis • Design and implement pilot projects • Clearinghouse for paint product stewardship policies, programs, and data. www.productstewardship.us • Glue holding the pieces together….

  6. Dialogue Group Focused On: • Post-consumer leftover paint - latex and oil-based • Retail surplus paint • Not on post-industrial paint waste

  7. During the Dialogue We Got Agreement on… • Problem Statement • Goals • Key Issues • Strategies  prioritized

  8. Why is Paint a Problem? • High volume • Significant cost to government to manage • Can contain low levels of VOCs, fungicides and hazardous metals (in very old paint) • Lack of infrastructure for recovery, reuse, recycling • Lack of markets for recycled paint Paint is a problem based on the volume, cost to manage, and high potential for increased recovery, reuse and recycling.

  9. The Primary Goal Is To Develop Initiatives That Result In: • Reduced paint waste; • Efficient collection, reuse, and recycling of leftover paint; • Increased markets for recycled paint; and • A sustainable financing system to cover end-of-life management costs.

  10. Secondary Goals Are To… • Decrease improper disposal of paint • Attain the highest value for surplus paint • Improve container collection and recycling • Reduce paint toxicity

  11. The Dialogue Phase… AGREEMENTS MEETING 4 Review progress Created MOU • Workgroups #1-3 • Develop findings • Draft work plans MEETING 1 • Workgroups #8-10 • Develop Findings • Draft work plans START Discuss Priority Issues and Strategies MEETING 3 • Groups #4-7: present findings/plans • Discuss Issues/Strategies #8-10 MEETING 2 Workgroup Activity • Workgroups #4-7 • Develop Findings • Draft work plans Dialogue Meeting • Groups #1-3: present findings/plans • Discuss Issues/Strategies #4-7 December 2003 April 2004 June 2004 September 2004

  12. The Memorandum of Understanding (MOU)Was Fully Executed on March 15, 2005

  13. Additionally… The MOU is a first step toward a nationally coordinated leftover paint management system Highlights Include: • Recognition of the problem with leftover paint • National waste reduction and management goals • Participant roles and responsibilities • Financing system (if needed)

  14. MOU Continued… • Project Portfolio – 11 projects • $1.2 million • Established multi-stakeholder steering committee to guide process • Timeframe for resuming financing discussion 18 months • Continue meeting for 2 years • MOU is not legally binding • MOU does not waive any rights or obligations

  15. The Purpose of the Projects • Demonstrate the potential to reduce the volume of leftover paint and the cost of managing leftover paint; • Increase the use of leftover paint as a resource; • Increase government and private purchase of products made from leftover paint.

  16. Project PortfolioFormation of Project Workgroups • Education - 2 projects (survey and pilot) • Infrastructure – 3 projects (reuse, model and $) • Markets – 3 projects (PPSI, Distributor, Recycled Paint Certification) • Regulatory - White Paper • Lifecycle and Cost/Benefit Analysis • Finance - National financing options

  17. A: The Steering Committee… Q: Who is Steering the Ship? • Manufacturers – 5 (NPCA 4, Dunn Edwards) • Recyclers – 1 (Amazon) • Retailers – 1 (vacant) • State government – 3 (WA, CA, FL) • Local government – 2 (Metro OR & Sonoma Cty CA) • Federal government –1 (EPA)

  18. Where Are We Now? • MOU signed by 31 participants + endorsed by 35 others outside dialogue • Seven projects have started - $850,000 raised from manufacturers, recyclers, and government • Workgroups are convened except for Financing Workgroup which starts in October

  19. Results to Date • Developed (by consensus) Guidance for the Management of Leftover Paint • Spinoffs • NH and VT  recycler • Earth 911 and NPCA • Private connections

  20. What Are The Next Steps? • Complete initial projects (raise funds for some) • Start last 4 projects • Convene Financing Workgroup • Accepting endorsements of MOU – 35 currently • Accepting technical assistance, workgroups • Accepting funding – can select a specific project

  21. We Have Come A Long Way in a Short Time! • Increased understanding – all participants • Increased manufacturer and retailer involvement • New relationships formed • Attitudes have changed – a lot!

  22. To Summarize…… • “Product Stewardship” is a tool in the toolbox • A Dialogue is both art and science • Paint dialogue is a good example of a product stewardship effort in the United States • You can support Product Stewardship by becoming a PSI member, endorsing the paint dialogue, funding the dialogue, and/or participating on a workgroup

  23. Heidi Sanborn PSI Consultant (916) 485-7753 Hksanborn@comcast.net Scott Cassel PSI Executive Director 617-236-4855 scott@productstewardship.us www.productstewardship.us For More Information Contact…