120 likes | 228 Views
Sunrider II. Assembly instructions Part 1 PPE & Tools. 19 January 2014. Contents part 1 Section Subjest Slide part 1 – 1 HSE 4 part 1 – 2 Tools 5. 1 . Persoonlijke beschermings-middelen (PBM). Use appropriate Personal Protective Equipment (PPE): Work gloves. Disposable gloves.
E N D
Sunrider II Assembly instructionsPart 1PPE & Tools 19 January 2014
Contents part 1 SectionSubjest Slide part 1 – 1 HSE 4 part 1 – 2 Tools 5
1. Persoonlijke beschermings-middelen (PBM)
Use appropriate Personal Protective Equipment (PPE): Work gloves. Disposable gloves. Hearing protection. Dusk mask. Safety goggles.
2. Tools.
Hole saw. ‘Cats-tail’ file.
Multi saw. (battery) drill. Power file.
Blind rivet pliers. Locking pliers. Rivet insert nut plier.
ScaleMixing cups, large, small.Stir wood. Grain 150 sandpaper. Sanding block.
Benzene. Clamps, jaw length ~90mm and140mm.
Sharp knife. Mastic gun. Ballast, minimum 25 kg (2x).