Session 1. Sequencing and Pacing of Performance Budgeting Reforms: Observations and Lessons from Korea. Nowook Park Center for Performance Evaluation & Management Korea Institute of Public Finance (KIPF). Contents. Sequencing and Pacing of PB Reforms in Korea Issues and Lessons.

spike
Download Presentation

Nowook Park Center for Performance Evaluation & Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Session 1. Sequencing and Pacing of Performance Budgeting Reforms:Observations and Lessons from Korea Nowook Park Center for Performance Evaluation & Management Korea Institute of Public Finance (KIPF)

  2. Contents • Sequencing and Pacing of PB Reforms in Korea • Issues and Lessons

  3. 1. Sequencing and Pacing of PB Reforms in Korea

  4. Building Blocks of PB • Program budgeting • Restructure budget structure to accommodate program goals • Accounting System • Appropriate distribution of overhead to each program is necessary to have relevant cost information • Accrual Accounting • Medium term expenditure framework • Performance Information and IT investment • Managerial & Financial Flexibility • Top down budgeting • Multiyear budgeting • Discretionary room for carry-over

  5. Characteristics of the Korean Approach (1) • Gradual Approach at the initial stage • Experimenting with pilot project between 2000-2002 • Selected departments within selected ministries are subject to the pilot project • Annual performance plan and report are developed by selected departments

  6. Characteristics of the Korean Approach (2) • Big bang approach with other fiscal reforms since 2003 • Medium term fiscal plan (2003*, 2005**) • Top down budgeting (2003*, 2004**) • Performance budgeting (2000*, 2005**) • Digital budget and accounting system • Program budgeting (2006**) • Accrual accounting (planned in 2009*) • IT system (2007**) (Note) *: pilot project, **: comprehensive implementation

  7. ’00~ ’02 ’03~ ’05~ ’06~ Performance Budgeting (Pilot Project) Performance Goal Management Self-Assessment of Budgetary Program In-Depth Evaluation • Expanded “Performance Budgeting” to 26 Ministries/agencies • Annual performance plan and report are required • Selected programs are subject to program evaluation • Developed Strategic Goals, Performance Objectives and Performance Indicators • Designed after GPRA • 1/3 of major budgetary programs are evaluated every year • Designed after PART Introduction of Performance Budgeting

  8. Enactment of National Finance Act • “National Finance Act” was enacted in December, 2006 • To provide a legal basis for 4 major fiscal reforms • Contains articles on performance-based budgeting • Annual Performance Plan and Report become legal requirements for line ministries/agencies. • SABP and In-depth Evaluation are stipulated. • It gives stability and continuity which may be a problem of performance management system. • Government has less incentives to maintain and improve performance management system than to introduce it, because efforts to improve the system are less visible to the public.

  9. Framework for Performance-Based Budgeting In Korea • Performance Monitoring • “Management of Performance Objectives” • Monitoring based on the performance indicators • Program Review • “Self-Assessment of Budgetary Program” • Review based on the checklist • Program Evaluation • “Budgetary Program Evaluation” • In-depth evaluation for selected programs

  10. Description of “Self-Assessment of Budgetary Program” • The central budget authority reviews self-assessment of programs done by line ministries/agencies • The budgetary authority provides a standardized checklist for reporting self-assessment • The checklist contains questions on design, performance management system, implementation, and actual performance • About 1/3 programs are reviewed each year

  11. Contents of Checklist Design and Planning • Program purpose • Rationale for government spending • Duplication with other programs • Efficiency of program design • Relevance of performance objectives and indicators • Relevance of performance targets Management • Monitoring efforts • Obstacles of program implementation • Implementation as planned • Efficiency improvement or budget saving Results and accountability • Independent program evaluation • Results • Satisfaction of citizens • Utilization of evaluation results

  12. Report on 2005-2007 Self Assessment of Budgetary Program • Evaluation results • Quality of performance information has not improved much • Programs are showing better results • Link between evaluation results and budget • Evaluation results are utilized at every stage of budget process • Moving away from incremental budgeting • Evaluated programs are subject to bigger budget change compared to other programs

  13. Evaluation Results by Rating

  14. Evaluation Results by Section

  15. Utilization of Evaluation Results • The central budget authority encouraged ministries/agencies to use the results in reshuffling budget allocation • The central budget authority announced at least 10% budget-cut would be done to “ineffective” programs, in principle • The central budget authority submitted evaluation results to the National Assembly upon their request • Evaluation results have been open to public since 2006

  16. Use of Performance Information by Agencies (2005)

  17. Use of Performance Information by the Central Budget Authority (2005)

  18. Use of Performance Information by Legislature (2005)

  19. Moving Away from Incremental Budgeting Programs have been subject to larger budget change after evaluation Coefficient of Variation in Funding Change (Excluding Programs of which funding change is greater than 200%)

  20. 2. Issues and Lessons

  21. Issues and Lessons –Sequencing and pacing of PB (1) • Program budgeting needs to be in place before performance budgeting • There are some inconsistencies between program structure and annual performance plan because different units are responsible for each task • If program structure had been in place before performance budgeting, costs of trial and error would have been avoided. • Top down budgeting was introduced to give more autonomy to line ministries but, in reality, it has not been realized

  22. Issues and Lessons –Sequencing and pacing of PB (2) • Sound cost accounting needs to be in place before performance budgeting • Overhead costs have not been properly distributed to each program, yet • Efficiency indicator has not been widely utilized but its use is encouraged from 2008 • Medium term fiscal plan and performance budgeting need to be linked to enhance decision making at macro-level budget allocation

  23. Changes in Consideration • Change of evaluation process is in consideration • Give more autonomy to line ministries to relieve the burden of evaluation from central budget authority • For example, instead of central budget authority’s evaluating every program, line ministries will have more autonomy in producing evaluation results. • Use of efficiency information is encouraged even though sound cost accounting is not in place yet

  24. Thank You!