230 likes | 330 Views
NWO-AB. missie. +. RuG LEI NIOZ UT TUe ASTRON AMOLF TUD SRON. samenwerking. Veel colleges, masteropleiding, onderzoeksschool (80 PhDs). APP. onderzoek. LHC. highlights. 2012!. LHC: Atlas. de theorie. . e. H ZZ ee . e. . LHC: Atlas. het experiment. LHC: Atlas.
E N D
+ RuG LEI NIOZ UT TUe ASTRON AMOLF TUD SRON samenwerking Veel colleges, masteropleiding, onderzoeksschool (80 PhDs)
APP onderzoek LHC
highlights 2012!
LHC: Atlas de theorie
e HZZee e LHC: Atlas het experiment
LHC: Atlas het resultaat
LHC: LHCb before
LHC: LHCb after
eind 2012:Higgs: bestaat hij of bestaat hij niet! (LHC) • rond 2016:directe observatie gravitatiegolven? (Virgo) • en ook nog:donkere materie? (LHC, XENON, KM3NeT)neutrino puntbronnen? (KM3NeT) kosmische stralingsbronnen? (AUGER) vooruitzichten
Veni Vidi Vici ERCadvanced grants ERC starting grants persoonsgebonden subsidies
Obviously, the LHC-physics or astroparticlephysicspart of the mission budget should not suffer …… It would allow Nikhef to continue with its grid and detector R&D projects, which have shown to be excellent breeding ground for valorisation activities and to be successful in acquiring additional funding, thus contributing heavily to Nikhef’s earning power. Strategisch Plan sectie 5.2 NWO-evaluatie The temporary increase of the mission budget by NWO and the dynamiseringsimpuls is coming to an end. The committee recommends that this is compensated by an increase in the mission budget of 1.1 M€/year to enable Nikhef to maintain its vitality and to achieve its goals. The increasing activity of knowledge and technology transfer (from an already excellent level) is a strong argument for not reducing the institute’s base funding. evaluation report
LHC upgrade, selected (no funds requested yet) “The strong link with technology and with computing fits well in the current priorities of the top sectors.” KM3NeT, selected (no funds requested yet) “Moreover, this facility fits well with the top sector policy, since high-end technology is involved in all aspects of the project.” E-infrastructuur, selected(but not funded) “E-infrastructuur is een cruciaal element voor een geavanceerde kennismaatschappij …” nationale roadmap
industrie topsectoren 2000
CERN CO2 koeling AMOLF massa spectroscopie industrie topsectoren
First contact: 2005 frequent overleg CERN visits Hidralon (794 k€), BiG Grid(~500 k€), INFIERI (submitted) First contact: 2000 frequent overleg CERN visits RELAXD (530 k€) industrie topsectoren
First contact: 2011 paar vergaderingen CERN visit CO2-koeler advies First contact: 2010 frequent overleg CERN visits 22-maart review@MIT industrie topsectoren en: CERN besteedt ~20 M€/jaar (1996-2009) in Nederland
vanavond, 20:55 op Nederland 2 outreach