1 / 31

SMOS SAG Meeting, ESAC-Villafranca del Castillo, 2-3 Nov 2006

Presentation of the study. KAUZAR SALEH YANN H. KERR COSMOS PROPOSAL TEAM. SMOS SAG Meeting, ESAC-Villafranca del Castillo, 2-3 Nov 2006. Outline. 1-CAMPAIGN DESCRIPTION 2-ACQUIRED DATA 3-QUICK-LOOKS 4-COSMOS DATA ANALYSIS SPP AND SCHEDULE.

stacey
Download Presentation

SMOS SAG Meeting, ESAC-Villafranca del Castillo, 2-3 Nov 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation of the study KAUZAR SALEH YANN H. KERR COSMOS PROPOSAL TEAM SMOS SAG Meeting, ESAC-Villafranca del Castillo, 2-3 Nov 2006

  2. Outline 1-CAMPAIGN DESCRIPTION 2-ACQUIRED DATA 3-QUICK-LOOKS 4-COSMOS DATA ANALYSIS SPP AND SCHEDULE SMOS SAG Meeting, ESAC-Villafranca del Castillo, 2-3 Nov 2006 1

  3. 2 1-COSMOS CAMPAIGN: Site NAFE-05 (31/10-25/11) Focus on high resolution retrievals, scaling and assimilation Cosmos & NAFE 2005 : Goulbourn COSMOS (13/10-09/12) Focus on SMOS L2 implementation, SMOS open issues, SMOS L2 validation NAFE-06 (/10-/11) Focus on SMOS scale retrievals, downscaling and assimilation NAFE 2006: Murrumbidgee

  4. MODELLING IMPROVEMENTS • [interception?, grass model?, soil model? … ] • SUN GLINT OVER LAND? • ANCILLARY DATA USEFUL? HOW DO WE USE IT? • SM LEVEL 2 CONCEPT VALIDATION • ERROR ANALYSIS 3 1-COSMOS CAMPAIGN: Objectives 2 SMOS L2 ALGORITHM VALIDATION 1 SMOS L2 ALGORITHM IMPLEMENTATION COSMOS/NAFE MOST COMPLETE AIRBORNE DATA SET OVER PRAIRIES- ‘OUTDOORS LAB’

  5. 250 m DEM Elevation above sea level (m) clay-loam clay loam sandy loam sand 4 1-COSMOS CAMPAIGN: Goulbourn catchment 8 FARMS Whole catchment area ~75km x 100km

  6. 5 1-COSMOS CAMPAIGN: Goulbourn catchment 8 FARMS Whole catchment area ~75km x 100km

  7. 6 1-COSMOS CAMPAIGN: EMIRAD and PLMR ECO-DIMONA SERA PLMR (TUD) L-BAND across/along-track POLARIMETRIC + 6 incidence angles (+/-7, +/-21.5, +/-38.5) EMIRAD (TUD)L-BANDalong-track POLARIMETRIC + Potter horns 37.6 deg & 30.6 deg HPBW (0 DEG AND 40 DEG TILT)

  8. 1-COSMOS CAMPAING: EMIRAD and PLMR ⇨ Opportunity for intercomparison between two L-band sensors 7

  9. 8 1-COSMOS CAMPAING: SOIL MOISTURE SAMPLING 15/11 Pembroke sampling 14/11 INTERMEDIATE RES: 125 m, 250 m HIGH RES: 12.5 m, 62.5 m ‘SUPER HIGH’ RES: 6.25 m REGIONAL RESOLUTION: 1 km (AMSR validation)

  10. LETTERS ARE FARM NAMES VEGETATION DATA NOT INCLUDED 2- ACQUIRED DATA (COSMOS PERIOD) 9

  11. 13/11 14/11 15/11 17/11 regular dew regular/sun glint regular rainfall 20/11 21/11 22/11 23/11 regular high altitude dew regular/high altitude rainfall 03/12 09/12 27/11 29/11 regular high altitude regular regular 3-Quick-looks: TB EMIRAD H POL (corrected for attitude and topography) .Type of flight [K] 10

  12. 3-Quick-looks: TB EMIRAD H POL (corrected for attitude and topography) EXAMPLE OF A REGULAR FLIGHT Grazing, wheat grazing Oats, barley 11

  13. 3-Quick-looks: TB EMIRAD (corrected for attitude and topography) EXAMPLE OF HIGH ALTITUDE FLIGHT Footprint size at nadir ~ 1200m x 1200 m nadir view 21/11 Soil moisture conditions: absence of rain for ~10 days Dynamic range: H pol- (20 K) -- V pol- (10 K) TB_V<TB_H at all nadir flights --- problem with nadir antenna H channel ? 12

  14. 3-Quick-looks: TB EMIRAD (corrected for attitude and topography) COMPARISON PLMR-EMIRAD (1): REGULAR FLIGHT EMIRAD PROBLEM WITH NADIR H CHANNEL? SMALL POL. RATIO PLMR EMIRAD TRACK IN BLUE 13

  15. 3-Quick-looks: TB EMIRAD (corrected for attitude) CALIBRATION ISSUES: flights over Glenbawn lake (e.g. 15/11) 14

  16. 3-Quick-looks: TB EMIRAD SUN GLINT EFFECTS 40 deg sun elevation observations ‘Diving’ flights 15

  17. 3-Quick-looks: RFI? (plots here t=0.1 s! …) Unknown Not associated to RFI Take-off & at the airport Take-off at airport Take-off at airport 16

  18. 17 4-Cosmos data analysis SPP SPP: Focus on exploitation of the COSMOS data set in view of: SMOS L2 ALGORITHM IMPLEMENTATION SMOS L2 ALGORITHM VALIDATION Cosmos Data Analysis proposal- Led by CESBIO/UPS Validity period: Nov. 2006-Nov. 2008 Year 1: Exploitation of the COSMOS data set Year 2: Complementation of the study (NAFE05-NAFE06) and further validation studies

  19. 4-Cosmos data analysis SPP: schedule 18

  20. 19 5-Conclusions COSMOS/NAFE site: Great ’Outdoors lab’ for SMOS Level 2 Implementation/Validation Complementary EMIRAD/PLMR flights: 6-week campaign, room for addressing a large number of issues (cross-comparison sensors, modelling of TB, sun glint, scale of soil moisture for validation, impact of ancillary data on retrievals …) Priority tasks: -- Check calibration of EMIRAD data to clarify nadir observations and problems derived from high temperature within the aircraft -- Obtain calibration flights from PLMR flights over Glenbawn lake -- Analyse faster sampling data for RFI detection -- Calibration of TIR measurements

  21. Extra (Work-packages)

More Related