RENEWABLE ENERGY & ENERGY EFFICIENCY IN MOROCCO SITUATION & PROSPECTS

RENEWABLE ENERGY & ENERGY EFFICIENCY IN MOROCCO SITUATION & PROSPECTS. Presented by M. Mustapha ENZILI Resources & Engineering Department (Morocco) CAIRO (EGYPT) – 28 JANUARY 2008. SUMMARY. Overview of Electricity in Morocco Renewable Energy Potential in Morocco

stanislaw
Download Presentation

RENEWABLE ENERGY & ENERGY EFFICIENCY IN MOROCCO SITUATION & PROSPECTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RENEWABLE ENERGY & ENERGY EFFICIENCY IN MOROCCOSITUATION & PROSPECTS Presented by M. Mustapha ENZILI Resources & Engineering Department (Morocco) CAIRO (EGYPT) – 28 JANUARY 2008

  2. SUMMARY • Overview of Electricity in Morocco • Renewable Energy Potential in Morocco • Capacity installed of Renewable Energy in Morocco • Projects programmed (2008-2012) • Grid-Connected RE Projects in Morocco - WindFarms Projects in Morocco- Solar Thermal Power Project in Morocco • Plan for implementation Wind Farms in Morocco 2008-2012 • Wind Farms in Morocco • Desalination seawater by wind energy in Morocco • Case study of Morocco (Needs project)

  3. OVERVIEW OF ENERGY IN MOROCCO

  4. ENERGY IN MOROCCO • 46 Milliards DH for imports of energy products (4 Milliards Euro) in 2006 • Average annual consumption growth of electricity : 8 % (2006/2005) • Capacity of Power Plant to install each year : 400-500 MW • The projections for the periods 2008-2010 & 2010-2015: - 2008-2010 : Consumption growth of 7.3 %- 2010-2015 : Consumption growth of 6.5 % • Energy consumption(GWh) - 2005 : 19 509 GWh- 2006 : 21 105 GWh - 2010 : 27 350 GWh- 2015 : 37 470 GWh

  5. ELECTRICITY IN MOROCCO CONSUMPTION IN 2006 : 21105 GWh - Thermal : 91 % - Hydro : 8 % - Wind : 1 %

  6. ELECTRICITY IN MOROCCO IN 2006 • Total Power plant : 5312 MW • Electricity consumption : 21105 GWh (2006); 19508 GWh(2005) • Growth of electrical consumption : 8.8 % per year • Electrical Power plant : - Thermal Power plant : 3469 MW ▪ Coal : 1785 MW ▪ Fuel Oil : 1284 MW ▪ Natural Gas : 400 MW - Hydraulic Power plant : 1729 MW - Wind Farms : 124 MW

  7. ELECTRICITY IN MOROCCO IN 2006 • Electricity Consumption : 21105 GWh • Electricity production : 19822 GWh - Thermal Power plant : 18054 GWh - Hydraulic Power plant : 1585 GWh - Wind Farm : 183 GWh * Imports : 2027 GWh

  8. ELECTRICAL INSTALLED CAPACITY IN MOROCCO (2007-2012)

  9. ELECTRICAL INSTALLED CAPACITY MOROCCO IN 2007-2015

  10. RURAL ELECTRIFICATION IN MOROCCO

  11. RENEWABLE ENERGY POTENTIAL IN MOROCCO

  12. RENEWABLE ENERY POTENTIAL INMOROCCO • SOLAR ENERGY : Morocco has an excellent Solar potential : 4,7 - 5,7 kWh/m2/day (2800 hours/year in the North, more than 3000 hours/year in the South of Morocco). • WIND ENERGY : Morocco has an excellent wind potential mainly in the North & in the South :- Tangier, Tetouan & Essaouira with an annual average between 9 & 11 m/s at 40 meters.- Tarfaya, Taza & Dakhla with an annual average between 7.5 m/s & 9 m/s at 40 meters. Wind Potential of Morocco : • Total Potential : 7936 TWh/year (3968 GW) • Technical Potential : 4896 TWh/year (2500 GW)(Electricity consumption in Morocco in 2006 : 21 TWh) • Wind Atlas of Morocco published in 1986 & 1995 and updated in 2007. • More than 50 measurements stations installed between 1990 & 2007

  13. WIND RESOURCE MAP OF MOROCCO

  14. SOLAR RESOURCE MAP OF MOROCCO

  15. CAPACITY INSTALLED OF RENEWABLE ENERGY IN MOROCCO

  16. RENEWABLE ENERGY IN MOROCCO (2007)

  17. PLAN FOR IMPLEMENTATION WINDFARMS & SOLAR THERMAL PROJECTS IN MOROCCO (2008-2012) • WindFarms Programmed : 1000 MW until 2012 • WindFarmsinstalled : 124 MW (2007) • Projects programmed : • - WindFarm 140 MW (Tangier); 2009 • - Gas + Solar Thermal + : 470 MW (Oujda) • * Solar Thermal (30 MW) • - WindFarm 300 MW (Tarfaya) • - WindFarm 100 MW (Taza) • - Wind Farm 240 MW (Laâyoune) • - Wind Farm 200 MW (Foum El Ouad – Laâyoune) • - Wind Farm 60 MW (Sendouk – Tangier)

  18. WIND FARMS IN MOROCCO

  19. PROJECT OF 50 MW (El Koudia El Baida -Tetouan) • Project : Power : 50 MW (84 Vestas 600 kW) Date production : 8/2000 Production : 195 GWh/year (2005) Feasibility Study : CDER BOT Project : CED (EDF-Germa / France) (selled to Theolia in december 2007) • Average wind speed at 40 meters : 10 m/s • Average wind speed in the best location in the site at 40 meters : 11 m/s

  20. PROJECT OF 50 MW (El Koudia El Baida -Tetouan)

  21. PROJECT OF 50 MWPRODUCTION BETWEEN 2001-2005

  22. PROJECT OF 3.5 MW(El Koudia El Baida -Tetouan) • Power : 3.5 MW • Date production : 3/2001 • Production : 13 GWh/year • Feasibility Study : CDER • Project : ONE • Average wind speed at 40 meters : 10 m/s

  23. WINDFARM 60 MWCAP SIM (ESSAOUIRA)  Power : 60 MW Windturbines : 71 Gamesa G52-850 kW Date production : 04/2007  Production estimated : 210 GWh/year  Avearage Wind speed (40 m) : 9.45 m/s Feasibility Study : CDER Project : ONE  Project Cost : 800 millions DH (72 Millions Euro)

  24. WINDFARM 60 MWCAP SIM (ESSAOUIRA)

  25. PROJECT OF 10 MW Lafarge (Ciments Factory of Tetouan)  Power : 10 MW  Windturbines : 12 * 850 kW (Gamesa)  Date production : 9/2005  Production estimated : 38 GWh/year  Wind energy Production : for Ciments factory (extra energy selled to the national electrical grid)  Project Cost : 110 millions DH (10 Millions Euro)

  26. PROJECT OF 10 MW Lafarge (Ciments Factory of Tetouan)

  27. WINDFARM 140 MW(TANGIER)  Power : 140 MW Windturbines : 165 Gamesa 850 kW Production estimated : 526 GWh/year  Avearage Wind speed (40 m) : 9 m/s Feasibility Study : CDER Project : ONE  Date production : 2009 Project Cost : 2750 millions DH (250 Millions Euro)

  28. FEASIBILITY STUDIES OF WINDFARMS PROJECTSIN MOROCCO

  29. PROJECTS OF TARFAYA & TAZA • Taza :  Power : 100 MW  Production estimated : 300 GWh/an  Average wind speed (40 m) : 8 m/s  Feasibility Study : CDER  Project : ONE • Tarfaya :  Power : 200 - 300 MW  Production estimated : 580 - 870 GWh/an Average wind speed (40 m) : 7.63 m/s Feasibility Study : CDER  Begin operation of the project : 2010 (International call of tenders launched in march 2007)

  30. FEASIBILITY STUDIES OF 8 WINDFARMS • Feasibility study CDER/IMET about 8 sites of WindFarms in Morocoo :Cap Hdid - My Bouzerktoune(Essaouira)  Sidi Garn(Tan-Tan)  Sahb Harcha(Tan-Tan)  Tarfaya  Sendouk(Ksar Sghir-Tanger)  Col Touahar(Taza)  Cap Cantin(Safi) • Conclusion of the study : Potential of 1500 MW in 8 siteswith a cost production between 3.31 to 5.69 Eurocent/kWh

  31. DESALINATION SEAWATER BY WIND ENERGY

  32. PROJECT OF TAN-TAN  Project : Desalination seawater by wind energy Situation : Tan-Tan city (933 kms in the south of Rabat) (near Atlantic coast) Water Production : - 6048 m3/day(2008) - 9502 m3/day(2010) - 11232 m3/day(2015) Wind Farms : Grid connected Power : - 5.6 MW(2008) - 8.8 MW(2010) - 11.2 MW(2015)  Production estimated : 25.52 GWh/an (2015) Average wind speed (40 m) : 6.82 m/s  Feasibility Study : CDER  Project : ONEP

  33. PROJECT OF AKHFENNIR • Parties of the Project : ONEP (Morocco) IMET (Italy) CDER (Morocco) • Project objectives : Desalination sea water by wind energy in Akhfennir village • Situation of the village : Near Atlantic Coast(1000 km in the South of Rabat, capital) • Number of inhabitants : 4000 residents permanently • Consumption of water : 860 m3/day (2008 - 2015) • Drinking water : Akhfennir village is supplied in drinking water by trucks cisterns from the city of Tan-Tan (120 DH/m3#11 Euro/m3)

  34. ENERGY EFFICIENCY

  35. ENERGY EFFICIENCY • Potentiel of economy of energy : 15% of the consumption until 2020 • Programme of energy efficiency: • Programme of energy efficiency in Building, • Projet of energy efficiency in Hospitals, • Programme of energy efficiency in Ministries & Publics administrations.

  36. RE & ENERGY EFFICIENCY • New Law about Renewables Energies & Energy Efficiency (17 may 2007); • New Law about autoproduction of electricity from 10 to 50 MW(25 january 2007);

  37. Preliminary results of calculations(Morocco)NEEDS PROJECT

  38. POWER PLANTS IN MOROCCO

  39. Jorf Lasfar Power Plant - Coal – Morocco 1360 MW - 10090 GWh/yr Damages Mio. EURO2000 per Year Cent2000 per kWh

  40. Mohammadia Power Plant - FuelCoal – Morocco600 MW - 3954 GWh/yr Damages Mio. EURO2000 per Year Cent2000 per kWh

  41. Kenitra Power Plant - Fuel –Morocco300 MW – 714 GWh/yr Damages Mio. EURO2000 per Year Cent2000 per kWh

  42. Tahadart Power Plant - Gas - Morocco400 MW - 2920 GWh/yr Damages Mio. EURO2000 per Year Cent2000 per kWh

  43. Jerada Power Plant - Coal - Morocco155 MW / 1080 GWh/yr Damages Mio. EURO2000 per Year Cent2000 per kWh

  44. Renewable Energy Development Center (CDER) Thank you for your Attention m.enzili@cder.org.ma enzili@hotmail.com www.cder.org.ma