An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Serenbe Palmetto, GA Case Study

  2. Project Summary Location: Palmetto, Georgia Acreage: 900 Units:Approx. 165 residential units, 115 Live/work units, 6 Commercial units Product Type:Smart Growth community with interconnected, variably-sized settlements, including small villages, hamlets and farmsteads. Master Plan:Two (2) distinct Hamlets (i.e. stand-alone communities), each arranged in an Omega design with 140 residential and commercial units Topography: Gently rolling Soil: Sandy loam

  3. Phase I. Summary Selborne Community Units:140 units, including approximately 50 live/work and 4 commercial Home Prices:$150,000 to over $1 million Absorption Rate:3-4 years

  4. Project Considerations • Municipal sewer service was not available • Community was planned with environmental sustainability as a top priority • Highest and best use achieved through clustered development with substantial open space • Minimize upfront capital investment, and spread cost over life of project. • Maximize economic return by providing project design flexibility; offering multiple products and price points. • Solution must provide for professional operation, maintenance and customer service

  5. Solution • Turnkey decentralized wastewater system • Design • Build • Operate • Collection System • Individual septic tanks with gravity collection • Treatment • Recirculating Sand/Gravel Filter combined with a Constructed Wetland • Disposal • Subsurface Drip Irrigation

  6. Ownership & Management • Once system is constructed and approved, ownership is transferred to Utility as “Contribution In-Aid” (non-taxable transaction). • Utility will own, operate and maintain system in perpetuity. (including individual and central system components ) • Utility is certified as wastewater system operator by the State of Georgia Department of Public Health? • Utility provides performance bond to the State Health Department and evidence of financial viability to the Public Service Commission

  7. Developer Benefits • Turn-key solution • Minimize upfront capital cost • Maximize development design flexibility • Utility company assumes operational liability • State of Georgia monitors system performance and financial viability of Utility • Ability to re-use treated effluent for community irrigation • Proven technology