Beam Dynamics Group in GDE Beijing meeting. 20100315 K. Kubo. What to do. Make some consensus on what emittance growth can be achieved. Do we now believe the goal in RDR is achievable? What is the risk involved in achieving it. Need to review past studies and understand the results.
E N D
Beam Dynamics Group in GDE Beijing meeting 20100315 K. Kubo
What to do • Make some consensus on what emittance growth can be achieved. • Do we now believe the goal in RDR is achievable? • What is the risk involved in achieving it. • Need to review past studies and understand the results. • Assumptions and how they might influence the final numbers. • Reports of updated studies • RTML and ML • From CLIC studies (common issues) • Make future plan • Man power is limited. (2~3 FET?) • Conveners: D. Schulte, N. Solyak and K. Kubo
Tentative Schedule 1 Mar.27. • 1100-1230 Planning of the working group1 • 1400-1530 Presentations • A.Latina: Update on the Single-Stage Bunch Compressor Option for the ILC • D.Wang: Update simulation results (BC + ML) • A.Latina: Considerations on ILC Main Linac Alignment • D .Schulte: Transverse dynamic effects in CLIC • 16:00 - 18:00 [Joint with ML] (talk list from ML group) • Shilun Pei: Analysis of FLASH Beam on Gradient Stability Data • Shinichiro Michizono: 9mA FLASH Workshop Summary • Nikolay Solyak: Update of RTML, FNAL BPM and Split SC Quad • Eiji Kako: Lorents Force Detuning Studies at STF • Kiyoshi Kubo: Main Linac Beam Dynamics
Tentative Schedule 2 Mar.28 • 0900-1030 Presentations • D .Schulte: Running the 3TeV CLIC at lower energies • A. Latina: Design of the CLIC Spin Rotator • D .Schulte: Drive beam phase and amplitude stabilization in CLIC • 1100-1230 Review (summary) of present status and plans • 1400-1530 [BDS] - ATF2 presentations • 1700-1800 [BDS+ML] - Low energy operation Mar. 29 • 0900-1030 Review (summary) of present status and plans • 1030-1230 [BDS+DR] ATF/ATF2 & ICB • 1400-1530 For working group summary report? • 16:30-18:00 [GDE Plenary]
“Review (summary) of present status and plans” • これまで何ができているか、できていないことは何かをまとめる。 • Make list of errors (misalignment etc.) in simulations. • List of tolerances, if possible. • Plan • 限られたマンパワーでなにができるか • CLIC との協力 (?) • 、、、、、、、、