An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Viking Estimation Team Assignment 13 Team 2-1

  2. Content 1/ Introduction 2 / Wideband Delphi &COCOMO II 3 / The assemble task formula 4/ Wideband Delphi process 5 / The result

  3. 1/ Introduction Firstly, our Team focuses on trade-off the technique, and then arrived at using the Combination of Wideband Delphi and using the COCOMO II at calibrate. The Trade-off rational is described in part 2. Wideband Delphi and COCOMO II. Next, our Team defines some formulas in order to generate the estimation result, based closely on Lecture 16 – SMA slide of Martin. These formulas are described in detail in part 3. The assemble task formula. After that, our Team record and describe how we did the estimation using those technique, also explain which data in which deliverable. In this part, you will see that the origin Wideband Delphi process is tailored, and also the COCOMO II included. For detail, those information is described in part 4.The Combination of Wideband Delphi and COCOMO II estimation executing.

  4. 2/ Wideband Delphi &COCOMO II Strengths :

  5. 3/ The assemble task formula:

  6. 4 / Wideband Delphi process • Team 2-1 discusses the product being developed and brainstorms any assumptions. Team 2-1 generated a task list consisting of 10 major tasks: • Planning • Kick-off • Business Modeling • Requirements , Analysis & Design • Develop Control Account Plan 2 • Develop Control Account Plan 3 • Develop Control Account Plan 4 • Develop Control Account Plan 5 • Develop Control Account Plan 6 • Administration.

  7. 5 / The result