An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTRODUCTION MAINTENANCE CENTER ALBANY MSgt Watkins

  2. MCA MFCS TEAM Maintenance Center Albany MFCS Management Team • Program Management Branch Head: Harold Eidson • Project Section Supervisor: Blase Goodman • Project Lead: Jim Clanton • Planner/Estimator: Rob Tyler • Industrial Engineering Tech: Keith Hamsley • MFP Liaison: MSgt Watkins • Assistant MFP Liaison: SSgt Collins • Contractor Service Support: Kevin Adams

  3. PRODUCTION Assets Completed FY11 • Mobile Facilities: • (5) JU-01s • (8) JF-05s – Army Assets • (5) KA-31s • (1) AM-01 • (1) CA-01 • (1) CA-04 • (1) SU-03 • TQGs: • (28) Preserved in an ‘RFU’ status

  4. SCHEDULE Assets in Process/Scheduled FY11: • Mobile Facilities: • (1) NB-03 • (1) LA-01 • (1) CS-02A • (1) CS-03B • (1) SU-01 • (2) AM-04A • (1) AM-03B • (1) AT-12 • (1) CR-03 • (1) BR-04A • (1) BR-05B • (1) PM-01 • (1) TR-01 • (1) CY-01 • (1) JU-01 • (1) SM-04B • (2) JF-10A • (2) JF-11B

  5. SCHEDULE Assets in Process/Scheduled FY11: • TQGs: • (51) Preservation for ‘RFU’ status • (3) Repair • Lift-Off Hinge: • (28) Cast hinges due in August • Send to Marine Container for CSC testing

  6. ROC LOC REMOVAL ROC LOC Removal/Storage Video

  7. ROC LOC INSTALL ROC LOC Install Video

  8. LIFT-OFF HINGE VIDEO LIFT-OFF HINGE VIDEO

  9. ISSUES/CONCERNS Issues/Concerns • Parts Issues • Obsolete parts • No longer required items in MF configurations • Fleet Returned MFs: • SOMFs panels need to be securely fastened • Naval Messages need to annotate what is missing from the inventory. • Fleet Assistance: • For information • For missing assets

  10. MCA MFCS TEAM POCS Maintenance Center Albany MFCS Team POCs • Project Lead: Jim Clanton • 229-639-7477 • Planner/Estimator: Rob Tyler • 229-639-6834 • Industrial Engineering Tech: Keith Hamsley • 229-639-7470 • MFP Liaison: MSgt Watkins • 229-639-9060 (DSN: 567) • Assistant MFP Liaison: SSgt Collins • 229-639-7207 (DSN: 567) • Contactor Service Support: Kevin Adams • 229-639-7061 (DSN: 567)

  11. QUESTIONS ARE THERE ANY QUESTIONS?