Status of the LHC Project Lyndon Evans Journées de Physique ATLAS France Autrans, 29 March 2006. Dipole cold masses. 416th and last BNN dipole (November 2005). Cryodipole overview. Dipole: integral field. Dipole: b3 integral field. Arc quadrupole cold masses. SSS overview.
E N D
Status of the LHC Project Lyndon Evans Journées de PhysiqueATLAS France Autrans, 29 March 2006
Preparation for installation in SMI2 Hall SMI2
24h endurance test of all power converters in 8-left (13-14 October 2005) 81 power converters in UA83 3 x 13 kA power converters 18 x 4 to 7 kA power converters 31 x 600 A power converters 29 x 120 A power converters 156 kA and 1.2 MW dissipated: PCs and Cables (estimation)
1400.0 1200.0 1000.0 800.0 600.0 400.0 200.0 0.0 24h endurance test of electrical network (13-14 October 2005) kW Total Other PC Dipole Power measured by TS-EL in SE8
Conclusions • All key objectives have been reached for the end of 2005 and installation is now proceeding smoothly. • Half of the machine has been liberated for magnet installation and is proceeding in 3 octants in parallel. Magnet installation is now steady at 20/wk and will ramp up to 25/wk next month. Installation will finish end February 2007. • Interconnect must now ramp up to plateau of 30/wk for the ring to be closed by spring 2007. • We will make every effort to have a first run in 2007.