An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eric M. Reimschiissel Contractors working with Agencies Tips for more cost effective projects

  2. Bidding Considerations • Cost effective projects • Getting the project done • Traffic control • Quality Control - Testing • Partnering INTRODUCTION

  3. Time of year to bid • Project information in the documents • Lump sum items - Unit cost items • Street location • Days of work BIDDING CONSIDERATIONS

  4. The Right treatment at the Right time on the Right pavement. • Do not expect miracles - understand the limitations of the product you are asking for • Write good specifications, practical and understandable specifications with the desired treatment outcome in mind. COST EFFECTIVE PROJECTS

  5. STOCKPILE LOCATIONS • STREET SCHEDULES • DAYS AND HOURS OF WORK • TYPES OF SLURRY SEAL • TYPES OF STREETS • STREET PREPARATIONS • PRODUCTION RATES – MINUTES COUNT • PLANNING IS CRITICAL REVIEWING THE PROJECT

  6. SAFETY loading and the public • LOCATION closeness and access • WATER SOURCE close by • SUROUNDINGS • DUST – TRACK OUT • NOISE do not wake up the residents Stockpile - staging areasare hard to find - need help

  7. FARTHEST AWAY FIRST • DAILY INCREMENTS • RESIDENT ACCESS • RESIDENTS NORMAL ROUTES • TYPES OF SLURRY SEAL • STREET PREPARATION - MARKING REMOVAL EXTRA CLEANING Street schedules – project layout

  8. RESIDENTIAL 7:00 and open 5:00 • BUSINESS - when closed • SCHOOLS – special needs –weekend • PARKS AND RECREATION AREAS • HEAVY TRAFFIC AREAS ALLOWED WORK DAYS AND HOURS

  9. DIFFERENT TYPES OF SLURRY SEAL • DURING THE SAME DAY • SET TIMES • BOX SET UP • MACHINE SETTINGS CHANGES FOR DIFFERENT TYPES OF SLURRY SEAL DURING THE DAY

  10. RESIDENTIAL • HANDICAP AND SPECIAL NEEDS • ARTERIAL – HEAVY COLLECTOR TRAFFIC • BUSINESS ACCESS • SCHOOLS & SCHOOL BUS ACCESS • HOSPITAL ACCESS • SPECIAL SITUATIONS DIFFERENT TYPES OF STREETS

  11. CLEANING OF THE SURFACE • PAVEMENT MARKING REMOVAL STRIPING-MARKER PROTECTION • TREE TRIMMING • WEEDS AND VEGITATION • IRRIGATION WATER • CRACK SEALING • ASPHALT REPAIRS SURFACE PREPARATIONS

  12. TYPE OF SYSTEM REQUIRED • TRAFFIC CONTROL PLAN • NOTIFCATIONS RESIDENTIAL • NOTIFICATIONS PERSONAL CONTACT • AGENCY AND BUSINESS • FLAG PERSONS • STREET CLOSURES • LANE CLOSURES • SPECIAL SIGNS AND TRAFFIC DEVISES TRAFFIC CONTROL

  13. COST VS. BENEFIT • AGGREGATE TESTING • EMULSION TESTING • ADDITIVE AND WATER TESTING • APPLICATION RATES – “VERIFY” • MIX DESIGN • CALIBRATIONS • TEST STRIPS • ON SITE SCALES QUALITY CONTROL AND MATERIAL TESTING

  14. LOADING TIME AT THE STOCKPILE • SHUTTLE TRUCK TIMES • TRAVEL TIME - CONSIDER • TRAFFIC ACCESS • LAYDOWN TIME – HAND WORK BOX WORK • MACHINE SPEED – AGG TONS MINUTE • CONTRACTOR MAKES MONEY ON TIME PRODUCTION TIME IS CRITICAL

  15. PREPARATION • PAYMENT • PARTNERING • PUNCH LIST • FAIRNESS AGENCY REPUTATION

  16. Be respectful • Be Honest – Keep your word • Be an asset on the project • Be a mediator with the City Depts. • Provide good project input • Do not be adversarial – be helpful • Plan ahead • Be attentive PARTNERING = WORKING TOGETHER

  17. GOD BLESS AMERICA AND OUR TROOPS

  18. WHEN YOUR NOT BUSY THINK ABOUT PAVEMENT PRESERVATION

  19. THANK YOU ANY QUESTIONS