190 likes | 209 Views
Eric M. Reimschiissel. Contractors working with Agencies Tips for more cost effective projects. Bidding Considerations Cost effective projects Getting the project done Traffic control Quality Control - Testing Partnering. INTRODUCTION. Time of year to bid
E N D
Eric M. Reimschiissel Contractors working with Agencies Tips for more cost effective projects
Bidding Considerations • Cost effective projects • Getting the project done • Traffic control • Quality Control - Testing • Partnering INTRODUCTION
Time of year to bid • Project information in the documents • Lump sum items - Unit cost items • Street location • Days of work BIDDING CONSIDERATIONS
The Right treatment at the Right time on the Right pavement. • Do not expect miracles - understand the limitations of the product you are asking for • Write good specifications, practical and understandable specifications with the desired treatment outcome in mind. COST EFFECTIVE PROJECTS
STOCKPILE LOCATIONS • STREET SCHEDULES • DAYS AND HOURS OF WORK • TYPES OF SLURRY SEAL • TYPES OF STREETS • STREET PREPARATIONS • PRODUCTION RATES – MINUTES COUNT • PLANNING IS CRITICAL REVIEWING THE PROJECT
SAFETY loading and the public • LOCATION closeness and access • WATER SOURCE close by • SUROUNDINGS • DUST – TRACK OUT • NOISE do not wake up the residents Stockpile - staging areasare hard to find - need help
FARTHEST AWAY FIRST • DAILY INCREMENTS • RESIDENT ACCESS • RESIDENTS NORMAL ROUTES • TYPES OF SLURRY SEAL • STREET PREPARATION - MARKING REMOVAL EXTRA CLEANING Street schedules – project layout
RESIDENTIAL 7:00 and open 5:00 • BUSINESS - when closed • SCHOOLS – special needs –weekend • PARKS AND RECREATION AREAS • HEAVY TRAFFIC AREAS ALLOWED WORK DAYS AND HOURS
DIFFERENT TYPES OF SLURRY SEAL • DURING THE SAME DAY • SET TIMES • BOX SET UP • MACHINE SETTINGS CHANGES FOR DIFFERENT TYPES OF SLURRY SEAL DURING THE DAY
RESIDENTIAL • HANDICAP AND SPECIAL NEEDS • ARTERIAL – HEAVY COLLECTOR TRAFFIC • BUSINESS ACCESS • SCHOOLS & SCHOOL BUS ACCESS • HOSPITAL ACCESS • SPECIAL SITUATIONS DIFFERENT TYPES OF STREETS
CLEANING OF THE SURFACE • PAVEMENT MARKING REMOVAL STRIPING-MARKER PROTECTION • TREE TRIMMING • WEEDS AND VEGITATION • IRRIGATION WATER • CRACK SEALING • ASPHALT REPAIRS SURFACE PREPARATIONS
TYPE OF SYSTEM REQUIRED • TRAFFIC CONTROL PLAN • NOTIFCATIONS RESIDENTIAL • NOTIFICATIONS PERSONAL CONTACT • AGENCY AND BUSINESS • FLAG PERSONS • STREET CLOSURES • LANE CLOSURES • SPECIAL SIGNS AND TRAFFIC DEVISES TRAFFIC CONTROL
COST VS. BENEFIT • AGGREGATE TESTING • EMULSION TESTING • ADDITIVE AND WATER TESTING • APPLICATION RATES – “VERIFY” • MIX DESIGN • CALIBRATIONS • TEST STRIPS • ON SITE SCALES QUALITY CONTROL AND MATERIAL TESTING
LOADING TIME AT THE STOCKPILE • SHUTTLE TRUCK TIMES • TRAVEL TIME - CONSIDER • TRAFFIC ACCESS • LAYDOWN TIME – HAND WORK BOX WORK • MACHINE SPEED – AGG TONS MINUTE • CONTRACTOR MAKES MONEY ON TIME PRODUCTION TIME IS CRITICAL
PREPARATION • PAYMENT • PARTNERING • PUNCH LIST • FAIRNESS AGENCY REPUTATION
Be respectful • Be Honest – Keep your word • Be an asset on the project • Be a mediator with the City Depts. • Provide good project input • Do not be adversarial – be helpful • Plan ahead • Be attentive PARTNERING = WORKING TOGETHER