Upcoming Dates Accumulator Ring: • ASAC Review September 24 • Collimator/Extraction Area/Design Reviews /Installation October 9, 10 • FY2003 Budget issues • Magnet Specification List – Individual Magnet Parameter Sheets • Meeting Friday 10/4 1:30 p.m. – S. Tepikian and M. Hemmer • Review them and SIGN THEM OFF • Monthly Report Today • DOE Review November 13
ASAC Review Ring specific comments presented by the committee: • Findings and fixes (shimming) on magnets are in good progress -- continue. • It would be good to verify proper field in the presence of vacuum pipe (e.g. HEBT magnet measurement with beam pipe although Ted claimed the pipe non-magnetic. • Good to see ring half cell to be tested and delivered to ORNL; looking forward to it. • RF work as presented is well done. • Vacuum work as presented is well done; more to go. • Looking forward to see planned, detailed field measurement of injection chicane magnet near H- electron stripping foil in comparison with 3D mapping. • Endorse the proposal of a new view port and video monitoring of carbon-carbon electron collector near injection. • Good work is done on impedance reduction of the extraction kickers; more needs to be done on impedance measurement of RF cavities. • Continue to explore beam loss mitigation • Fast feedback, as presented by J. Galambos, can be tried e.g. to position beam on the stripping foil • Electron cloud: (a) procure and install elements that can disturb ring vacuum system, including clearing electrode at injection and solenoid windings at collimation section (b) procureother devices as budget allows • Comments on collective effects and others are to be included in the written summary (not presented).
Hechler, Hunter, Murdoch Visit Agenda Wednesday, October 9 7:45-8:30 911B Small Conference Room BNIP phone conference W. Birkholz, J. Brodowski, G. Mahler 8:30-9:00 911B Small Conference Room Danfysik phone conference W. Birkholz, J. Brodowski, G. Mahler 9:00 – 9:30 911B Small Conference Room Tesla phone conference W. Birkholz, J. Brodowski, G. Mahler 9:30 – 11:00 911B Small Conference Room Injection area layout and installation. J. Brodowski, C. Pai, L. Russo 11:00 – 12:00 911B Large Conference Room General ME meeting J. Tuozzolo 1:00 – 3:00 911B Small Conference Room Ring Collimators and Moveable Scraper, HEBT Collimator Design, and RTBT Collimator Update H. Ludewig, N. Simos, J. Brodowski 3:15 – 5:00 817 Video Conference Room Ring Lattice Drawing, Survey, Installation Drawings, and Magnet Parameter List M. Hemmer, D. Raparia, S. Tepikian, J. Alduino
Hechler, Hunter, Murdoch Visit Agenda Thursday, October 10 8:15 – 9:00 902 Assembly Area Magnet Testing, Measurement, and Assembly Schedule for Ring ½ Cell Magnets R. Anderson, S. Seberg, W. Birkholz, J. Jackson, G. Mahler, V. Badea, J. Tuozzolo, P. Wanderer. 9:00 – 10:00 817 Video Conference Room Assembly Schedule for Ring ½ Cell Magnets R. Anderson, S. Seberg, W. Birkholz, G. Mahler, V. Badea, J. Tuozzolo 10:00 – 12:00 817 Video Conference Room RTBT/HEBT Magnet/Vacuum Installation J. Rank, D. Weiss, D. Hseuh 1:00 – 3:00 817 Video Conference Room Extraction Straight Section Layout, Magnet Design Review, and Installation J. Rank, C. Pai
Collimators • Friday 11:00 Weekly Meeting in the EAG Conference Room • Collimator lifting fixture design/weight reduction. • Collimator end shielding redesign. • Procurement STATUS – Weekly Phone Conference • HEBT Collimator Beam Line Layout • HEBT Stripper Design • HEBT Momentum Collimator – Installation/Shielding layout. • Ring Moveable Collimator – Installation Layout. • Moveable Shield Drawings to Back Correction fy 2003 procurement
HEBT Magnets and Beamline HEBT Dipole • 1, 2, 3, 4, 5, and 6 at ORNL • ORNL has measured the magnets to 1% 8D408 at ORNL HEBT 12Q45 Quadrupole/16CD20 Corrector Requisition – • Production delivery of 17 magnets – Water fitting repair HEBT/RTBT 27CD30 Corrector • NETC – Ordering Material HEBT/RTBT 21Q40 Quadrupole • Phase II Magnets to be shipped to BNL for measurement. • Magnet Sled and Stand Design in Checking
Ring Magnets • 902 ½ Cell Assembly Area • Shipping Date for #1 - October 31, 2002 - assembly status • Water fitting repairs • Lifting fixture modifications – Status • Production Schedule • 17D120 • ITF quality progress – magnets measured and accepted. • Spare magnet shipping? • 21Q40 Quadrupole – 17 magnets in house (#1) • 21 cm Production Measurement Schedule • Tesla Schedule • Water fitting repairs • 26Q Quadrupole Requisition • 2nd Iteration Chamfer Machining Status.
Ring Magnets • 30Q Quadrupole Requisition – Contract w/BNIP • Magnet Measurement Completion Date • BNIP Production Schedule • 21S26 High Field Sextupole • Coil Modification ECN • 26S26 High Field Sextupole • Drawings in checking • SOW and Spec. • 27CDM30 Corrector (#3) – 29 in house • All Magnets Received • Ready Production Measurement
Ring Magnets • 21CO26 Corrector (#4) – 8 in house • Ready for production measurement • 21CS26 Corrector(#2) – 8 in house • Production Measurement Status – Estimate to Complete • 41CDM26 Corrector • Magnet Measurement Complete - Approved for Production • 36CDM26 Corrector • 1st article delivered September 13, 2002 • Failed Hi-Pot • Return to Vendor ASAP – this week
Special Injection Magnets – Overall Design Layout Injection Septum Magnet • Status – both magnets assembled? • Testing Complete - Magnet Travelers Injection Dump Septum Magnet Injection Chicane Magnets #2, #3 • NETC Contract, PCR for spares. Thin Foil Mechanism – Testing and Acceptance 7/30/02. Thick (Injection Dump) foil design status. Injection Magnet #4 – Acceptance Testing Status Injection Magnet #1 Complete Redesign. Injection Kicker Magnets • 1st articles ready for testing – Coated Ceramic Chamber?? • Ferrite Order Status, Ceramic Chamber Order Status • RFQ to Shops
Special Extraction And RTBT Magnets Extraction Kicker Magnets • Design Status • Design Review Lambertson Magnet • Design Status • Design Review RTBT Magnets and Line – DESIGN REVIEW 17D244 Magnet Procurement – 7/31/02 – Need New Scheduled Date 36Q85 • Raynor fabrication of Magnet Cores – STATUS • Coil Material Delivered