1 / 10

160E

1. 2&3 (Diverge from 140W). 40N. 11. POXED. ADGOR. KALNA. MTT (Minimum Time Track). EMRON. 160E. 2 +2min. (2&3). 1. 3 +6min. 40N. POXED. ADGOR. 11 +4min. KALNA. EMRON. Priority for TRK 1. 160E. 2. (1). 3 +2min. 1 +4min. 40N. R591. 11. POXED.

Download Presentation

160E

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1 2&3 (Diverge from 140W) 40N 11 POXED ADGOR KALNA MTT (Minimum Time Track) EMRON 160E

  2. 2 +2min (2&3) 1 3 +6min 40N POXED ADGOR 11 +4min KALNA EMRON Priority for TRK 1 160E

  3. 2 (1) 3 +2min 1 +4min 40N R591 11 POXED ADGOR KALNA EMRON Priority for TRK 2 160E

  4. (2&3) 2+0 1 +1min 3 +2min 40N 11 POXED ADGOR ADGOR Divergence KALNA EMRON 160E

  5. 1 2&3 (Diverge from 140W) 40N A590 11 POXED ADGOR KALNA EMRON MTT (Minimum Time Track) 160E

  6. 2 3 1 1 40N A590 POXED Divergence POXED ADGOR KALNA EMRON 160E

  7. 1 2 A590 3 R591 40N G344 POXED 1 160E

  8. 0700UTC R591 G344 40N January ~ December, 2013 POXED ---835 TRACK E : 48days ADGOR KALNA / day 17.4 EMRON TRACK F : 130days ---419 / day 3.2

  9. Questions?

More Related