Boston Survivor Accessibility Alliance (BSAA) Construction Program Flow Chart & Procedures

Boston Survivor Accessibility Alliance (BSAA) Construction Program Flow Chart & Procedures. Boston Survivor Accessibility Alliance (BSAA) Construction Program Flow Chart. Applicant submits Request. Request Approved. DPS Assigns RDP to Conduct Site Visit and Assessment.

Download Presentation

Boston Survivor Accessibility Alliance (BSAA) Construction Program Flow Chart & Procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Boston Survivor Accessibility Alliance (BSAA) Construction Program Flow Chart & Procedures

  2. Boston Survivor Accessibility Alliance (BSAA) Construction Program Flow Chart Applicantsubmits Request Request Approved DPS Assigns RDP to Conduct Site Visit and Assessment RDP Creates Construction Documents DPS Selects Construction Trades Request Denied or Incomplete RDP, Construction Trades, and ApplicantDevelop Construction Schedule and Contract Request Returned to Applicant for Corrections Project Completion RDP, Construction Trades, DPS and Applicantsign-off. RDP Submits Building Permit Application Site Visit and Assessment Form BMCP Request RDP Oversees Construction Building Official and Others Conduct Inspections

  3. BSAA Mission & Scope • The mission of the Boston Survivor Accessibility Alliance (BSAA) is to assist with recovery efforts for those affected by the marathon day bombings by helping to provide adequate: • Access to, from, in and around their home or, at times, business by use of ramps or vertical transport; • Installation of alarms or other fire protection devices; • Widening, reconfiguring and\or otherwise altering kitchens, bathrooms and other areas to accommodate life style changes. The main scope of work will focus on physical modifications to the affected party, owner occupied home. Consideration will be given to survivor-owned businesses.

  4. BSAA Participants • The BSAA will be comprised of: • DPS employees; • Architects; • Engineers; • Contractors; • Building Supply Contractors; • Inspectional Officials; and Others, all of whom will donate time, services and materials to help complete necessary modifications to homes and businesses as defined by the project mission and scope.

  5. Step 1 Applicantsubmits a request to the BSAA describing the type of work on a form designed for that purpose, i.e. • New ramp; • Vertical Lift; • Bathroom remodel; • Kitchen remodel. BSAA Project Manager (DPS) reviews the request for accuracy and completeness and: • Approves request; • Returns for corrections; or • Denies.

  6. Step 2 • DPSreaches out to American Institute of Architects (AIA) who assigns a Registered Design Professional (RDP) to conduct site visit, assess and measure existing conditions in order to develop project scope and construction documents. • The RDP contacts DPS with a list of likely trade organizations who will be involved in the process.

  7. Step 3 • Registered Design Professional (RDP) develops construction documents. • RDP reviews with applicant & conceptually talks about schedules and timelines for completion.

  8. Step 4 • DPSconfers with appropriate group to assign a contractor. • Contractor reviews schedules and timelines for completion with RDP and owner representative. • Contractor reports back to DPS with start and anticipated completion dates.

  9. Step 5 • RDP, Contractor, and ApplicantDevelop Construction Schedule and Standard Contract. • Contractor reviews issues of workers compensation and liability insurance.

  10. Step 6 • RDPsubmits necessary permit applications. • RDP reports back to DPS with an update identifying likely date for receipt of permits and start of construction.

  11. Step 7 • Contractorbegins work. • RDP oversees construction as necessary. • RDP periodically reports back to DPS with progress.

  12. Step 8 • Building Official (and others as necessary) conduct inspections. • Building Official reports back to DPS with progress.

  13. Step 9 • RDP, Contractor, DPSand Applicant review and sign-off on final project success. • DPS records project as completed in the database.