Integration TestBed (iTB) and Operations Provisioning. Leigh Grundhoefer. Architecture, Requirements and Services into the OSG. Release Candidate. Blueprint (ARCH). ITB 0.3. Integration Test Bed. Operations OSG 0.4. Provisioning. VO’s. Deployment Activity. Release Description.

stew
Download Presentation

Integration TestBed (iTB) and Operations Provisioning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integration TestBed (iTB)and Operations Provisioning Leigh Grundhoefer

  2. Architecture, Requirements and Services into the OSG Release Candidate Blueprint (ARCH) ITB 0.3 Integration Test Bed Operations OSG 0.4 Provisioning VO’s Deployment Activity Release Description Service Development (Sponsored Activities) Technical Groups

  3. http://osg.ivdgl.org/twiki/bin/view/Integration/NewOSGServiceshttp://osg.ivdgl.org/twiki/bin/view/Integration/NewOSGServices

  4. Service Description • Provide a functional description of the service • Describe resource requirements • Describe dependencies • Describe the integration validation test

  5. Installation and Configuration • Discuss site-level install & configuration procedures (if applicable) • Describe ITB-level service installation & configuration (if applicable) • GridCat and Monalisa fall into this category • Delivery method • e.g. Tools used (Pacman, RPM, via GRAM) • Configuration high points • Main set of issues that require attention

  6. Test and Validate • The service is considered tested after: • site level test (post-install): • resource provider test: • application test: • service monitor? • each of these should be described in terms of functionality and scale

  7. Support and Documentation • Information created in the twiki for the iTB Release • Support to osg-int@opensciencegrid.org • Or directly to the service providers • Known Issues updated for the iTB Release

  8. OSG Integration Activity OSG Integration Activity Readiness plan Effort Resources Readiness plan adopted VO Application Software Installation Software & packaging OSG Deployment Activity Service deployment OSG Operations-Provisioning Activity Release Candidate Application validation Middleware Interoperability Functionality & Scalability Tests feedback Metrics & Certification Release Description

  9. Installation cache setup • http://software.grid.iu.edu/pacman/ • pacman packages • pre-compiled binaries • source code ( compiled on the site ) • RPM capable • Configuration mechanisms • VDT setup questions • VDT installed configuration_X • OSG installed configure_osg Provisioning

  10. Documentation • Translate OSG information to production operations area • Provide timelines for Support Centers and Resources • Versioning • Deploy or upgrade grid-wide services Provisioning

  11. Common Questions • Why can’t we move services through more quickly? • Why can’t the software/software work the first time?