1 / 2

Board assembling/ Firmware Development

3 rd Generation EWOD Schedules:. Board Testing and Debugging. Board assembling/ Firmware Development. GUI design. This week: “EWOD board” $386 to be fabricated by P.C.B.A.ELECTRONIC (Wu Xi) LTD .(10 days) “Adapter” $163 to be fabricated by Chongqing HangLing LTD.(10 days)

stian
Download Presentation

Board assembling/ Firmware Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3rd Generation EWOD Schedules: Board Testing and Debugging Board assembling/ Firmware Development GUI design GroupMeeting 9/7/2013 Jia Li

  2. This week: “EWOD board” $386 to be fabricated by P.C.B.A.ELECTRONIC (Wu Xi) LTD.(10 days) “Adapter” $163 to be fabricated by Chongqing HangLing LTD.(10 days) Shipment: $65(3 days) GUI based on C# 1. USB protocol (This week, undone) 2. Droplet Volume manifestation; 3. Heater driver interface; Quick Response Code on the PCB Board: I’ve seen one case(not popular) who print the Quick Response Code on the PCB board(Bottom Overlay) . User can be directed to the forum by taking a snap of the code using their cellphone. The trade mark is at the center of the Quick Response Code. GroupMeeting 9/7/2013 Jia Li

More Related