1 / 2

Outdoor Kitchen Cabinet - Custom Kitchen Cabinets Now

Stockbox Kitchen specialises in quality kitchen design, planning, delivery and installation. We have the best Kitchen Cabinets Suppliers and manufactures in Canada. Book an in home kitchen planning appointment today!<br>Learn more: https://www.stockboxkitchens.ca/products/<br>

Download Presentation

Outdoor Kitchen Cabinet - Custom Kitchen Cabinets Now

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How To Install Kitchen Installation In Toronto Every kitchen needs cabinets for storing kitchen appliances. You can opt to buy custom-made kitchen cabinets or make them. Custom-made cabinets are a bit expensive, and without the budget, you can make them yourself. However, you need to have the suitable materials and tools to complete the work to do this. Here's all the information on how to install cabinets. Prepare the Kitchen for Installation 1.When installing cabinets do it after wiring and plumbing are done and before finishing flooring. Installing cabinets before flooring will help you save on the flooring, and also, new floors won't be at risk of damage. If you are renovating to remove old cabinets, do it carefully to avoid damaging the walls. 2.It will be helpful when you are taking measurements. When removing old cabinets, remove all doors, pull out the drawers and lift out any removable shelves. You need a helper to help remove upper cabinets as you extract the screws. 3.Also, ensure your walls are level, smooth, and clean before installing. To check the level, use a long straightedge against them and mark any bump or void so that you can adjust during installation. 4.When you have your cabinets, unpack them and ensure all components are in the package. If you got your Kitchen cabinets Manufacturers in Ontario, Canada, and they are disassembled, please follow the instructions. Always add the drawers, doors, and shelves after cabinet installation. Cabinet Installation

  2. Upper Cabinets Installation of upper cabinets takes place before the lower cabinets. It will make it easy for you as you won't have to work over lower cabinets. When doing kitchen installation Toronto, you need to assemble the cabinets following the manufacturer's instructions. If your cabinets are not going to sit on the ceiling, you will need to make a line on the wall to fix the cabinets. You need to measure 36 inches from the floor, then add 18 inches. It will act as the line to rest the bottom of your cabinets. Make use of a stud finder and a level to mark each stud. Mark the studs from top to bottom to use the line as a reference when installing lower cabinets. You can use two ways to fasten upper cabinets by simply screwing through the back of the cabinet or a French cleat. Always use many screws to ensure the cabinets are stable to withstand heavy kitchenware weight. Lower Cabinets After installing the upper cabinets, it's time for the lower cabinets. Remove all doors, drawers, and shelves to prevent damage and make the cabinet light. Before installing, it's good to come up with a layout. Start by laying out all cabinets except the sink cabinet. Then get the plumbing measurement for your sink base and transfer it to the back of the cabinet. Then using a drill equipped with a hole saw bit or jigsaw to make holes. When done, push the base into place and shim the studs well to ensure the fronts of the cabinets are flush with one another. Then use wedge shims at every point you have a stud mark and adjust each cabinet's depth till their fronts align. If they are okay, secure the cabinet together using trigger clamps and screw the cabinets to one another. Then attach them to the wall and use a level to check the tops of the front and back of the cabinets. If there are low spots, use wedge shims on the floor to raise them. Screw your cabinets and adjust the shims one at a time. Finally, you can install your countertops and your appliances. Once you finish installing everything, it's time to attach the doors and any other hardware. Contact Us Stockbox Kitchens 787 Warden Avenue, Toronto, ON M1L 4C2 +1 416 288 8008 info@stockboxkitchens.ca https://www.stockboxkitchens.ca/

More Related