1 / 7

김수봉 200 8 년 10 월 10 일

Overview of Status (at 9th RENO collaboration meeting). 김수봉 200 8 년 10 월 10 일. 사업내용. 2009. 2006. 2007. 2008. Activities. 12. 12. 12. 12. 3. 3. 3. 3. 6. 6. 6. 6. 9. 9. 9. 9. 검출장비 설계 및 사양 결정. Detector Design & Specification. 암반 지질조사 및 터널 설계. Geological Survey

Download Presentation

김수봉 200 8 년 10 월 10 일

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of Status (at 9thRENO collaboration meeting) 김수봉 2008년 10월 10일

  2. 사업내용 2009 2006 2007 2008 Activities 12 12 12 12 3 3 3 3 6 6 6 6 9 9 9 9 검출장비 설계 및 사양 결정 Detector Design & Specification 암반 지질조사 및 터널 설계 Geological Survey & Tunnel Design 터널굴착 및 지하시설 구축 Detector Construction 검출장비 제작 및 설치 검출장비 시험가동 Detector Commissioning 중성미자검출설비구축사업 추진 일정표

  3. 세부과제의 추진 내용 • 지하검출시설구축 - 2008년 7월부터 터널 굴착공사 시작 (~50% 진척) - 터널 굴착공사 완료 (2008년 11월말), • 검출기 제작 - 축소형 검출기(mockup) 완성 단계, RENO 검출기 구조물 최종 설계 및 발주 - Electronics 준비 완료/PMT 구입/LS 구입 - 2009년 초부터 검출기 설치 • Gd + Liquid ScintillatorR&D - Gd+ligand 제작 중, long term stability 검증, 방사능 농도 측정 중 - LS handling system 최종 설계 및 발주 • 데이터 및 MC 분석 - 데이터 포맷 결정, 데이터/MC 분석 환경 정비 - Cosmic muon reconstruction/Neutron background 계산/Event display - DAQ 프로그램 및 Monitoring system 준비

  4. 당면 과제 및 계획 • 안전한 터널공사 완료 및 부대 시설 구축 • 축소형 검출기 성능 검증 • 본격적 검출기 제작 및 설치 (연구원 추가확보) • 현지 연구소 구축 • TDR 작성 완료 • 외국참여연구진 유치 • 국제자문위원회(위원장: 김정욱)의 사업 평가 계획 (2009년 4월경) • 실험 수행을 위한 연구비 확보

  5. 국제학회 및 세미나 발표 • Feb. 24 - Mar. 1, 2008, 김영덕, Rencontres de Physique de la Vallee d'Aoste, La Thuile, Italy • March 23, 2008, 주경광, "Current Status of RENO", JPS Meeting at Osaka, Kinki University, Japan • April 24, 2008, 주경광, "Current Status of RENO", Journal Club at Fermilab, USA • May 20 - 22, 2008, 김수봉, Symposium on "Physics of Massive Neutrinos (PMN08)", Milos, Greece • May 25 - 31, 2008, 이재승, The XXIII International Conference on Neutrino Physics and Astrophysics, Christchurch, New Zealand • Sep. 6 - 13, 2008, 오영도, Neutrino Oscillation Workshop 2008 (NOW 2008), Conca Specchiulla, Otranto, Italy

  6. 논문이 기대되는 주제들 • Mock-up Detector (NIM or JKPS) - positron/gammadetection efficiency, detection efficiency of gammas from neutron capture by Gd, ….. • Gd Loaded Liquid Scintillator (NIM) - Gd loading recipes and their efficiencies, Long term stability - Radiopurity measurement • Background estimation at RENO (NIM or JKPS) - Event rates from (1) radioactivity in liquid scintillator, (2) radioactivity in acrylic, (3) radioactivity in PMT, (3) radioactivity in the surrounding rock - Various radiopurity measurement results - Cosmic muon rates - Event rate due to neutrons from cosmic muons • RENO calibration systems (NIM)

  7. Measurement Accuracy of Gd Concentration (NIM) - Comparison of Cf source data and its MC • Uncertainty of Reactor Neutrino Flux (NIM) - Thermal power measurement, Fuel composition, … - Multiple reactor effect - Reactor-off data • Separation of Multiple Reactor Neutrino Fluxes Using Reconstructed Neutrino Direction (???) - Reconstructing the direction of incoming reactor neutrino or of emitting neutron (vertices of positron and neutron capture) - Individual reactor fuel composition and thermal power measurement - Reactor-off data • RENO Electronics & Data Acquisition System (NIM) - Electronic modules, Trigger, DAQ • RENO PMT charaterization (NIM) - PMT afterpulse structure, magnetic field effect, time resolution • RENO Detector (NIM)

More Related