An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MTA beam line installation Weekly ReportOctober 12th , 2007Period covered:October 5th October 12th (Week 10)Report on the MTA beam line – MuCool side Shutdown’07 Week 10 F.G. Garcia MTA – Week 8

  2. MTA Weekly Report – Week 10 • Mechanical work • Beam stop #2 assembled, tested, delivered and installed • All stands installed and secured • Alignment • Work continue with the referencing of MW system • Electrical work • Inst. group connected all BPM, BLM and toroid cables. • Vacuum work • All vacuum connections are complete • Initial rough vacuum by 10/11. Milestone accomplished • No leaks were found at this time • Leak check is expected to take place today • In the near future, we’ll have to break vacuum in order to install the MW apparatus inside the vacuum cans. Shutdown’07 Week 10 F.G. Garcia

  3. MTA Weekly Report – Week 10 • Other activities • MTA safety system testing complete • Access into the enclosure must be done under control access The MTA beam line has been installed! Many thanks to AD, PPD and TD for their support and for making their exceptional experts available to work on this project. Their enthusiasm and perspective was exactly what this project needed in order to succeed. Shutdown’07 Week 10 F.G. Garcia