1. A work breakdown structure is • a hierarchy of tasks, subtasks, and work packages • a Cost and Performance tracking schedule • a structure that is incompatible with the Critical Path Method • a simple list of the activities making up a project • Quiz Answers just a click awayOPS 571 Week 4 Quiz • 2. The vertical axis on a Gantt chart is usually which of the following? • Activities • Time • Cost • Profit Copyright. All Rights Reserved by www.StudentWhiz.com
3. Which of the following identifies a key principle of Reengineering? • Organize around tasks. • Downsize (layoff) workers and do the same amount of work as before. • Merge information processing work into the real work that produces the information. • Capture information both at the source and where it is interpreted. • 4. At the onset, a project originates as which of the following? • A Gantt chart • A series of milestones • Critical path method (CPM) • A statement of work (SOW • Want help? Click to download OPS 571 Week 4 Quiz Answers Copyright. All Rights Reserved by www.StudentWhiz.com
5. Consulting firms typically use which of the following techniques to plan and monitor the engagements of the firm or specific projects? • CPM/PERT • Qualitative forecasting • Materials requirements planning (MRP) • Quantitative layout • 6. A Responsibility Chart specifically identifies which of the following? • Planning the tasks for a project • Customer satisfaction • Commitment to quality • Level of inventory • Want more details? Download now OPS 571 All Quiz Answers Copyright. All Rights Reserved by www.StudentWhiz.com
7. Which of the following would be the result of subdividing a project? • Job orders • Work events • Job categories • Tasks • 8. Which project progress technique includes the essential features of a project plan, budgeted cost of work scheduled and budgeted cost of work performed? • Earned value management • Critical path method • Cost analysis • Gantt chart • Final Exam Answers just a click awayOPS 571 Final Exam Copyright. All Rights Reserved by www.StudentWhiz.com
9. An example of a graphic project report utilized within project management is: • Project proposal • Equipment and supplies chart • Humphrey chart • Cost and performance tracking schedule • About Author • This article covers the topic for the University Of Phoenix OPS 571 Week 4 Quiz. The author is working in the field of education from last 5 years. This article covers the basic of OPS 571 Week 4 Quiz Assignmentfrom UOP. Copyright. All Rights Reserved by www.StudentWhiz.com