Interaction Region: a terse summary

Interaction Region: a terse summary. Conveners: K. Trabelsi, W. Kozanecki. Accelerator issues Parameter comparison with PEP-II/KEKB IR layout Particle-loss mechanisms Thermal issues Detector issues Machine background predictions Detector radiation-protection & beam-abort

studs
Download Presentation

Interaction Region: a terse summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interaction Region: a terse summary Conveners: K. Trabelsi, W. Kozanecki • Accelerator issues • Parameter comparison with PEP-II/KEKB • IR layout • Particle-loss mechanisms • Thermal issues • Detector issues • Machine background predictions • Detector radiation-protection & beam-abort • Luminosity monitor • Subdetector-specific issues (DCH, trigger, TOF) • Summary: the most critical/urgent studies A very lively & productive interchange between BEPC & BES experts!

  2. T: WK • Introduction • Experience in PEP-II & BaBar: Iimportance of an integrated approach to • Solving layout problems • Predicting (now) & understanding (later) machine backgrounds • IR heating issues (SR, HOM) • Machine operation (injection, abort,...) • Accelerator issues • Parameter comparison: BEPCII vs B-factories • Same beam-current & L regime • The joys & the pains of 2-ring machines • Some issues harder, a few easier • IR layout • orbits, BSCs, aperture constraints, … T: Xu Gang Major implications for machine + SR backgrounds

  3. Accelerator issues (ct’d) • IR layout (cont’d) • Mechanical & vacuum interfaces • Significant enginering “challenge” in accomodating necessary mechanical/vacuum interfaces in the heart of BESIII T: HUANG Nan

  4. Accelerator issues (ct’d) • IR layout (cont’d) • Mechanical & vacuum interfaces • “support tube” approach (BaBar) impractical bec. of DCH conical shape

  5. I bunch Gap size driven by kicker rise time Ring circumference • Accelerator issues (ct’d) • Particle-loss mechanisms • Injection • Injected e-: prob. OK • Injected e+: e inj/stored ~10 ==> x-baam size x 3-4, ==> (present) clearance ~ 1 sinjected • If confirmed,  !! • Need better understanding of injected beam specs (A+D) • may need to collimate (“shave off”) tails in linac, before injection • Beam abort: gap needed • Touscheck: need background calculation (A+D;Turtle!) • Beam-beam brems (aka radiative Bhabhas): where do the debris go? (Turtle!) • Need iterative vacuum calculations (bgd! A+D)

  6. Accelerator issues (ct’d) • Thermal issues: IR very sensitive • Synchrotron radiation • HOM losses BaBar luminosity presently limited by heating here

  7. Detector issues • Machine background predictions • Radiation tolerance of BES subdetectors • Most sensitive to injection: calorimeter • Most sensitive to stored beam: DCH • Numbers & criteria/specs needed! • Occupancy issues in BES subdetectors (esp. trigger) • Numbers & criteria/specs needed! • Background simulations • Belle experience • Early BES beam-gas & SR studies T: K. Trabelsi T:Jin Dapeng

  8. Detector issues (ct ’d) • Machine background predictions (ct ’d) • Background simulations (ct ’d) • Early BES beam-gas & SR studies T:Jin Dapeng Total power Total photon flux

  9. 1M trigger rate SVT abort diode Chronic dose trip level • Detector issues (ct ’d) • Detector radiation-protection & beam-abort: consensus it is absolutely needed

  10. (HER) beam blow-up Luminosity by bunch • Detector issues (ct ’d) • Luminosity monitor • Absolute: large- and/or medium angle BhaBhas • Relative: 0°-BhaBhas (e+ e-g) • Water Cerenkov referred (Belle), 1/side • essential for • Machine optimization • Beam-beam centering (feedback) • b-b vertical (y-z) alignment • IP beam size measurements • Bunch train diagnostics • Machine vs detector operation • Trigger: must accommodate easily arbitrary bunch patterns • TOF: consider separate timing signal from trigger (phase drift along train) • DCH: turn HV off/on afap

  11. Summary: the top of the list…. • IR layout : trade-offs between • Orbits • Backgrounds • Engineering • Injection !! • Abort gap => kicker R&D • Background simulations • SR • Beam-gas • Touscheck