The Detector Chapter of T he Detector Concept Report. GLD Meeting 3 October, 2006 Akiya Miyamoto. The RDR and DCR. DCR is associated with the RDR: Due end of 2006 Detector Concept Report consists of Physics section : ~50 Pages
E N D
The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto GLD Meeting
The RDR and DCR • DCR is associated with the RDR: Due end of 2006 • Detector Concept Report consists of • Physics section : ~50 Pages • Editors: Klaus Moening, Yasuhiro Okada, Joe Lykken, Mark Oreglia, Satoru Yamashita, Adbelhak Djouadi • Wiki page: http://www.linearcollider.org/wiki/ • Detector section: ~150 pages • Editors: Ties Behnke, C.J.S.Damerell, John Jaros, A.M. • Based on detector DOD's and input from experts • DCR is for Non-ILC HEP researchers/beginners • Executive summary • Executive summaries of RDR+DCR physics + DCR detector Executive Summary with a help of communication experts GLD Meeting
Purpose of the Detector Section • Based on four DOD's and input from experts • Prepared by 4 editors + authors to be enlisted • Goal of the detector chapter: • To demonstrate that • Detectors which can do the ILC physics are within reach • The case for detector and concept R&D are made GLD Meeting
Activities of the Detector Editors • Bangalore, LCWS2006. • Detector editor met for the first time and exchanged initial idea • Met with physics editor • Version 1 was presented at LCWS2006 • Joined WWS phone meetings in April and June to discuss the DCR. • Held phone meetings several times and version 2 draft was presented at VLCW06: • DCR related presentations are at http://www.linearcollider.org/wiki/ • Held weekly phone meeting since late August • To nominate authors of each sections • To develop outline of each sections • Hope to release a full text version at ECFA meeting GLD Meeting
John Jaros + Experts Concept teams (Who?) Ties Behnke + MDI experts(T.Tauchi) C.Damerell + R&D panels A.Miyamoto + Concept Rep. open 2IR panels Costing panels Experts : T.Takahashi + ?? + ?? WWS OC The Outline of the Detector Chapter • General Introduction • Challenges for Detector Design and Technology • Introduction to the Detector Concepts • MDI Issues • Subsystem Designs and Technologies • Sub-Detector Performance • Integrated Physics Performance • Why We need 2IRs and 2 Detectors • Detector Costs • Future Options • Next Step • Conclusion GLD Meeting
An example of Outline of each section: Challenge of detector design and technology • Editors (John Jaros) + Tim Barklow + Henri Videau + Keisuke Fujii • Outlines • Jet energy resolution: Required lum. vs resolution. • s(nnWW/ZZ), Br(HWW*), s(HHZ), SUSY(WW/ZZ) • Momentum resolution: • Recoil mass of ZH llX , Slepton Mass, Lum weighted ECM det. from m pair and mmg • Vertexing at ILC • Br(Hbb), Br(Hcc,gg), AFB(bb) with vertex charge • Challenges imposed by the ILC beam structure • Beamcal • High rad. Env., reacdout each bunch, need to veto H.E. e at the smallest possible angle • S(SUSY) vs veto efficiency, electron angle, .. • Others • Ebeam, Pol., High B Solenoid., Muons, required R&D Needs to collect requirements to detectors as much as possible GLD Meeting
An example of Outline of each section: sub-system performance • Philosophy • Pickup typical results from concept studies in order to show that detector performance used in the physics chapter is confirmed with some extent by full simulations. • Outline • Basics:Material budget of detectors • Tracker performacne • Momentum resolution: TPC (GLD, LDC, 4th), SiD • Track reconstruction: TPC & Silicon • Calorimeter Performance • Single particle: Energy resolution, angular resolution • PFA: 2 jets events, at Z pole and different energy • Particle ID in Jets • Vertexing • Inpact parameter, b/c tagging, charge tagging • Muon ID • Beam Cal Performance • New full simulation results are highly waited. GLD Meeting
Time line to prepare the detector chapter • Time line: • At Vancouver: • Propose the outline • Authors are nominated/selected • By End of September • First draft including major part of figures collected. • Some figures will be preliminary • By End of October=ECFA meeting at Valencia • Combine drafts, make a balance, editing, draft open to society • By End of November • Get feedback from community • By end of 2006: • Shape up and complete DCR Slower than the initial plan GLD Meeting