1 / 42

THINK HIGH AIM HIGH

THINK HIGH AIM HIGH. HOA LAC HI-TECH PARK MAGNET FOR HI-TECH INVESTMENT. THINK HIGH AIM HIGH. OUR LOCATION. Int’ Airport. . . Cailan. 60 min. 2 hour & 1/2. Ha Noi. . 25 min. HHTP. Directly connected by freeways, belt-roads, fly-overs,etc. Hai Phong. Thang Long Freeway

sukey
Download Presentation

THINK HIGH AIM HIGH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THINK HIGHAIM HIGH HOA LAC HI-TECH PARK MAGNET FOR HI-TECH INVESTMENT

  2. THINK HIGHAIM HIGH

  3. OUR LOCATION Int’ Airport   Cailan 60 min 2 hour & 1/2 Ha Noi  25 min HHTP Directly connected by freeways, belt-roads, fly-overs,etc Hai Phong Thang Long Freeway 6-lanes, 140meters wide, 30km long highway with technical corridors

  4. Hanoi National University : 1000 ha 2020: 60.000 stds. 2050: 100.000 stds.

  5. OUR MISSION Promoting R&D activities Enhancing hi-tech product manufacturing and commercialization Providing business incubation Improving human resource development in hi-tech areas A multifunctional science city aiming at: 1st hi-tech park in Vietnam one of the most important projects under the Vietnamese Government

  6. OUR MASTER PLAN Functional Zones: • Education & Training Zone: 108ha • Research & Development Zone: 229ha • Hi-Tech Industrial Zone: 549.5ha • Software Park: 76ha • Service Zone: 87.7 ha • Center Area: 50ha • Housing Complex: 26ha • Residential & Office Zone: 42 ha • Recreation and Sport Area: 33.5ha • Amenity Zone : 110 ha TOTAL AREA: 1586 ha (appx. 4000 acres)

  7. Smart communities model

  8. Smart communities model (con’t)

  9. Smart Communities model (con’t)

  10. Smart Communities model (con’t)

  11. Smart Communities model (con’t)

  12. Smart Communities model (con’t)

  13. Smart Communities model (con’t)

  14. Main Functional Zones

  15. Main Functional Zones (con’t)

  16. INFRASTRUCTURE • Water supply • External water plant of 600,000 m3/dayusing surface water (by Vinaconex); • Power Supply • Supplied from National Power Grid 500kV • One 110/35/22kV, 25MVA substation and distribution transformers 22kV/0.4kV to facilities • 3 x 63 MVA substation (by 2016) • Internet Service • Optical fiber cable invested by VNPT, Viettel, FPT, etc

  17. INFRASTRUCTURE (con’t) • Sewerage • 1st drainage system and a waste water treatment plant 6,000m3/day; • 2nd drainage system and a waste water treatment plant of 36,000m3/day (by 2016) • Solid waste • To be transported to a landfill by URENCO

  18. Implementation schedule • Phase 1: Completed by Vietnamese Government budget: US$ 124 mil • Phase 2: Japanese Official Development Assistant (ODA) loan: US$ 547 mil • Phase 1 (Detail design) : US$ 206 mil • Phase 2 (Construction) : US$ 341 mil

  19. Implementation schedule (Con’t) • 3/2011: Signed Loan agreement for Phase 1 (Detail design) • 12/2012: Completed Detail design • 6/2012: Signed Loan agreement for Phase 2 (Construction) • 3/2013: Bidding for Construction phase • 6/2013: Start construction • 4/2016: Complete construction

  20. INVESTMENT CRITERIA Fields of Hi-Tech Information Technology Biotechnology New Material Technology Automation Technology R&D Expenses: 1% of annual turnover Number of workforces in R&D: 5% of total employees Advanced Technology: 1/3 automatic devices Environment Friendly Operation: TCVN, ISO 14000 (encouragement)

  21. INVESTMENT INCENTIVES Corporate Income Tax Exemption for the first 04 years; 5% for the next 09 years; 10% for the next 2 years Prolonged period to enjoy preferential CIT rate for a number of special projects Exemption from import duties for goods imported as part of fixed assets; Exemption from VAT for equipment, machinery and specialized transportation means not manufactured locally and imported as part of fixed assets; One-stop administrative services: online customs, IP, ISO 9001:2008…

  22. Investment License: 68projects Registered Capital: US 2.6bil Occupation Land: 304 ha 2012: 7licensed projects Registered Capital: US 1 bil INVESTMENT ATTRACTION

  23. PROJECTS IN OPERATION

  24. FPT UNIVERSITY

  25. Medlac Pharma Italia

  26. NISSAN TECHNO VIETNAM

  27. NOBLE ELECTRONIC VIETNAM

  28. FC HOA LAC JSC

  29. VIKOMED JSC

  30. Investment Seminar in USA INVESTMENT PROMOTION

  31. Investment Seminar in Taiwan INVESTMENT PROMOTION

  32. INVESTMENT PROMOTION • Investment Seminar in Japan

  33. Business matching in Vietnam and Korea INVESTMENT PROMOTION

  34. INVESTMENT PROMOTION • Investment conference in HHTP in 2011

  35. INTERNATIONAL COLLABORATION Belarus: Belarus Hi-tech Park Germany: Inwent Korea: + Daedeok Innopilis + Chungnam Techno Park Taiwan: - HSP- III- CTSP • USA: • VSVN • SAVVI • Vinetworks • ... Board Member of Asian Science Park Association (ASPA)

  36. A member of the Executive Director Board of Asian Science Park Association (ASPA) A member of the International Association of Science Parks (IASP) INTERNATIONAL COLLABORATION

  37. INTERNATIONAL COLLABORATION • Signing MOU with many partners

  38. WHY’S HOA LAC HI-TECH PARK? • Strategic Location • High-skilled and abundant human resources • Modern and synchronous infrastructure • Highest investment incentives • One-stop administrative services • Friendly investment environment

  39. POLICIES ON TECHNOLOGY TRANSFER • Exemption from corporate income tax (CIT) for: • Incomes generated from these technologies for organizations contributing as capital technologies for establishing enterprises or performing business cooperation contracts. • Incomes generated from the application of technologies for four years, provided that the total exempted tax amount does not exceed 50% of total investment in technology renewal for enterprises investing in technology renewal and receiving technologies on the list of technologies encouraged for transfer. • Exemption from Import duty for: • Goods imported for direct use in technology research and development, technology renewal • Goods used for technology replacement or renewal and raw materials, supplies and parts used for production for five years from the commencement of the production with new technologies • Machinery, equipment and special-purpose means of transport which cannot be manufactured nationwide and need to be imported for the performance of technology transfer contracts are not liable to value-added tax.

  40. POLICIES ON TECHNOLOGY TRANSFER • Enterprises received technology transfer can access loan with low interest or interest rate assistance; loan guarantee(via National science & technology development Foundation and National Innovation technology) • Supports to attend training programs, consultation activities, technology transfer promotion event, etc,… • Foreigners and Vietnamese residing overseas who participate in transfer of a technology and their family members shall be issued with a multiple entry/exit visa for a term consistent with the duration for implementation of the technology transfer contract

  41. For more detail, please contact:HOA LAC HI-TECH PARK MANAGEMENT BOARDAdd: Km 29 Thang Long Freeway, Thach That, Ha Noi, VietnamEmail: infor@hhtp.gov.vnWebsite: http://www.hhtp.gov.vnTel. (84 4) 6326 9295Fax. (84 4) 6326 9290

  42. Thank you very much for your attention!

More Related