1 / 3

How to Deploy Dynamics 365 Business Central In A Manufacturing Location

For manufacturers, efficiency and flexibility are crucial for processes that are smooth. As the leading supplier of Enterprise Resource Planning (ERP) in the production industry, Microsoft has taken these vital factors into account using its Dynamics 365 Business Central solution. Business Central is gaining ground by focusing on business intelligence and process improvement. Business Central can play a part in a manufacturing or assembly environment.

Download Presentation

How to Deploy Dynamics 365 Business Central In A Manufacturing Location

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to Deploy Dynamics 365 Business Central In A Manufacturing Location For manufacturers, efficiency and flexibility are crucial for processes that are smooth. As the leading supplier of Enterprise Resource Planning (ERP) in the production industry, Microsoft has taken these vital factors into account using its Dynamics 365 Business Central solution. Business Central is gaining ground by focusing on business intelligence and process improvement. Business Central can play a part in a manufacturing or assembly environment. Listed below are 6 Ways Business Central may be used to boost your assembly/production processes in a production environment: 1. Ability to store and control the surroundings In situations where the subassemblies are built-in inventory for use in procedures with raw materials or other subassemblies to make a final product, the system can be configured as follows: The sub-assemblies can have an assembly policy for warehouse manufacturing in which the replenishment system takes an account of demand (high need for actual orders or low demand for forecasting or planning parameters such as the order purpose or safety stock) to make sure that the stock of the sub-assembly is determined by an optimal level to support the final assembly or production of the finished products used with these parts. Finished products can have a contract Manufacturing /assembly coverage in which the replenishment system checks difficulty in demand for products to ensure that orders are placed to meet with challenging demand. 2. Cost evaluation that is precise with workshop entry /Manufacturing time Together with Business Central, workshop staff can enter and exit for the day, fulfil a production order/arrangement for a task that is particular, and complete a particular job by scanning travellers using a code and scanning an ID card. This way, staff may have an instrument with which they can follow at any time from the field if it is linked to an order/manufacturing order or if it's associated with downtime.

  2. This actual time recorded for a production or an arrangement the production order is then automatically passed to by order /in order to record the real cost so that deviations could be assessed if necessary. 3. Ease to barcode and the scanner during all warehouse activities With the solution warehouse employees also can work on tablet computers and portable scanning devices in Business Central with a device that is connected. For shelves could be connected to the tow engines using a scanner, so the tow motor team members may perform all activities in real time. 4. Simplified Consumption reports for work /production orders The system could be configured rinse or to rinse low-cost components from a Bill of Material with no team member. This can be configured for things like bolts, washers, screws, etc. which must be utilized in the order/production order, but don't need to take into account the specific amount consumed and oblige users to enter this data manually. Expected quantities could be included in the order inventory cans increase inventory stock as required. This is suggested for higher volume items to maximize the production/assembly process. 5. Standard cost evaluation Business Central could be configured to utilize standard Costs. The system can calculate the standard for building/producing a product dependent on the components list and work plan (offices and prices used in the procedure). In each sequence, a gap analysis can be done in the end to identify outliers that investigate possible assembly/production issues. 6. Batch and sequential monitoring of components or Subassemblies throughout all system activities To monitor key components that may enter the Environment using a serial or lot number could be configured to require this information and track it thoroughly to boost the visibility of item usage. Whenever a sub-assembly or a raw material arrives in the System, a serial or lot number can be scanned to then follow the specific movements. When a batch or serialized thing is used, an individual can note which item was used in sales process and the production /assembly to Keep track of where the elements were utilized. When a provider batch is remembered, a procedure can be conducted to inform staff members of any

  3. completed Sub-assembly or Merchandise involved with this batch in order to perform a Proactive investigation or recall.

More Related