SeismoSat – Critical Design Review

SeismoSat – Critical Design Review. Group Members. Lan Gao – Weight & Balance James ( Ju Heon ) Lee – EPS & OBDH Aditya Vishwanathan – Structural & Telecoms Ding Yan – Thermal Analysis. Table of Contents. List of Components Mechanical Mass and Balance analysis

sunila
Download Presentation

SeismoSat – Critical Design Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SeismoSat – Critical Design Review

  2. Group Members • Lan Gao – Weight & Balance • James (JuHeon) Lee – EPS & OBDH • Aditya Vishwanathan – Structural & Telecoms • Ding Yan – Thermal Analysis

  3. Table of Contents • List of Components • Mechanical • Mass and Balance analysis • Disturbance and Control Stability analysis • Structural, Thermal analysis • Electrical • Power Analysis • Communication Throughput analysis • Software • Software Latency and Throughput analysis • Fault analysis • Final Design

  4. List of Components

  5. Key Changes and Notes • Passive Control: Magnets • Stanford University has Clarified that Passive Control was sufficient • Boom Length Decreased to ~ 20cm • Long boom length was to distant sensor away from electronic noise. With proper filters, we can afford to reduce boom length

  6. Key Changes and Notes (Cont.) • Magnetometer Sensor Length Decrease • Reduced to lower satellite’s weight • search coil’s size with respect to the additional amplification need was simulated. To decide on its new size.

  7. Key Changes and Notes (Cont.) • Change in Material: Carbon Fibre Side Panels • Reduces weight significantly • Does not significantly effect the overall structural strength • CPU uses PIC18F452 • Familiar to work with • Rad-Hardening not necessary for a proof of concept work • Has all the functionality needed.

  8. Mechanical – Mass Analysis Total Mass = 3.544kg A reduction of approx. 1kg

  9. Mechanical – Balance Analysis Centre of Mass Moment of Inertia

  10. Mechanical – Control

  11. Mechanical – Disturbance Gravity Gradient Solar Pressure

  12. Mechanical – Disturbance (Cont.) Aerodynamic Drag

  13. Mechanical – Control Stability Angular Acceleration with Passive Control:

  14. Mechanical – Structural Analysis

  15. Mechanical – Structural Analysis (Cont.)

  16. Mechanical – Thermal Analysis

  17. Electrical - Power Analysis

  18. Electrical - Communication Throughput Analysis • COMPONENTS: • Antennas • Satellite: Four monopole steel tape UHF antennas • Ground Station: ISIS Yagi UHF antenna • Tekk T-Net Mini (Half duplex crystal controlled radio) • Baypac BP-96a Modem

  19. Electrical - Communication Throughput Analysis (Cont.) DOWNLINK ANALYSIS: • Demodulation Information • Data Rate: 9600 bps • BPSK

  20. Electrical - Communication Throughput Analysis (Cont.) UPLINK ANALYSIS: • Demodulation Information • Data Rate: 1200 bps • AFSK

  21. Software – Software Latency and Throughput analysis • Sources of Latency: • Clock Cycles to execute each assembly command • Time taken to complete one assembly command is generally 100 ns (period of the internal clock cycle) • 9600 BAUD Rate in communication between the Modem and the RS-232 • 9600 BAUD Rate is equivalent to, at the longest 9600 bits per second; meaning the maximum delay of 104 ms per bit transfer/receive

  22. Software – Fault Analysis • Sources of Error • Over Saturated commanded per timer interrupt • The SPI and RS-232 commands which are executed within the Timer interrupt can pose a significant delay; to the point of creating an infinite interrupt loop. • RX Pin sharing • Switching the RX pin between Tekk and GPS can cause mismatches and switching errors unless the timing as been defined properly • Payload error due to external interference • A general source of error, where external hardwares, radiation and the likes can either generate noisy signals, or even corrupt data.