1 / 42

Learning

Learn about the importance of sustained action to reduce risk to human life and property from natural hazards. This includes buying, elevating, and moving flood-prone structures as part of emergency management.

surrett
Download Presentation

Learning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Learning June 2004 Lydeana Martin New River Valley Planning District Commission

  2. Mitigation • “Sustained action taken to reduce or eliminate long-term risk to human life and property from natural hazards and their effect.” • National Flood Insurance Program (esp. ordinance component) • Buying, elevating and/or moving flood-prone structures • Part of Emergency Management • Not emergency preparedness & response

  3. Why We’re Doing This • Meet Federal eligibility for FEMA assistance, Disaster Mitigation Act 2000 (local plans by 11/1/04) • Scenarios for funding: • Pre-disaster mitigation ($250,000 state) • Post-disaster mitigation (up to 7.5% of total response & recovery assistance); following Presidentially-declared disaster • Other federal collaborations in the future? • Each locality: list of priority mitigation projects • It makes sense: Save lives, property, protect resources

  4. Regional Hazard Mitigation Planning • Public participation • Hazards • Risk Assessment and Vulnerability • Existing Mitigation • Additional Mitigation options • “Local Plans,” implementation and project list(s) • Plan Maintenance • Adoption

  5. Virginia DEM Guidance, November 2003 • Which towns must actively participate • Review Process: • VDEM and FEMA for pre-approval • Localities for adoption • VDEM and FEMA for final approval

  6. How We’re Doing This • Public Planning Process • Monthly meetings began June, 2002 • Some special meetings in Towns as requested • Special Local Government Planners meetings and Admin’s and Managers • Participate in regional conferences

  7. HAZARD Summary: 1965-2000

  8. SUMMARY of HAZARDS Based on 125-year history Based on 125 years

  9. FLOODS: History WORST (Recent) CASE: Date: February 22, 2003 Severity: rain on ice/snow accum;Presidential-disaster declaration in Montgomery Co. Location: NRV Damages: one person died, a few homes flooded, several small bridges lost N Fk Roanoke R. Photo from The Roanoke Times Photo by Scott Stewart Allegheny Springs

  10. Flood, 2003 • Town of Pulaski Downtown Pulaski Rt 99 Pulaski Dora Hwy Pulaski

  11. Flood, 2003 • Floyd and Giles Co. • State road damage ($200,000 in Floyd County), private bridges, small stream flooding Beside 460 in Giles Co. RU Dedmon clean-up Rt. 8, Floyd Co.

  12. July, 2002 • “greater Pembroke” & Giles Co. • 4-5” rain in 4 hours • $400,000 in damage to homes & bldgs Pembroke area

  13. FLOODING: Risks SPECIAL HAZARD AREAS: Montgomery Co: Blacksburg : Stroubles Creek Christiansburg: College Ave. Shawsville/Ellison/Lafayette/Allegheny Springs; N & S Roanoke & Brake Br Plum Creek Giles Co. (NR, Doe Creek, Kow Camp) Pembroke (460, Castlerock, Cascade) Narrows (NR & Wolf Cr) Pearisburg(Wenonah Ave, Clifford, Chestnut) Pulaski County: Town of Pulaski (Downtown, Dora Highway and Kersey’s Bottom) NRV

  14. Closer Look at High Risk Areas

  15. North Fork of Roanoke River FLOOD: WHAT’s at High Risk?

  16. FLOOD: WHAT’s at High Risk? Three assumptions when drive into water: • That water isn’t strong enough to sweep you away (just takes a few inches of swift) • That the road/bridge is still there • That road/bridge is still strong

  17. Existing FLOOD Mitigation • Preventative/legal/policy: Zoning/floodplain management • Property Protection: Acquisition,Relocating, elevating, retrofitting, insurance • Emergency Services: Monitoring, Warning, etc. • Structures: channels, floodwalls, dry hydrant, drainage system maintenance, etc. • Natural Resource Protection: wetlands, setbacks, BMP’s, E&S • Public Information: newsletter, library resources, maps, technical assistance, environmental education

  18. FLOODING: Existing Mitigation Emergency Services: IFLOWS Automated Rain Gauges • Updated every 15 minutes • www.afws.net Giles Co NE Floyd Co E Montgomery Co W Pulaski Co

  19. FLOODING: Additional Mitigation • Preventative/legal/policy • Integrate hazard mitigation planning into Comprehensive Plan • Better enforcement and/or tightening of Floodplain regulations • Forest Conservation: • 1 AC Trees=5,000+cubic ft water retention • 1 AC Trees=$10,000+ on 1-time storm water restructure Source: American Forests, June, 2002 • Storm water management ordinance • Community Rating System

  20. FLOODING: Existing Mitigation • Enhanced stormdrain maintenance (routine, before and after storms)—Pulaski, Pembroke • “Farm fences” Farm Fence in Floyd Co

  21. FLOODING: Additional Mitigation • Emergency Services: • Work toward compatible communication systems across NRV (Homeland Security) • Reverse-911 or other electronic notification • Develop swift-water rescue capacity in NRV

  22. DROUGHT • "drought" means a moisture deficit bad enough to have social, environmental or economic effects (Drought Mitigation Center) • Unlike other natural disasters, the “event” can last for years—no rushing sirens Mountain Lake, October, 2002

  23. DROUGHT: History • WORST (Recent) CASE: • Date:1998-2002 • Severity: D3 “Extreme Drought” • Location: eastern US; all NRV • Damages:$10 millAgri. Loss; extreme fire danger; widespread water shortages or restrictions

  24. DROUGHT: Risk • FREQUENCY: • Some level most every ten years; most recent probably 50-year event? • SPECIAL HAZARD AREAS: • Agricultural areas; • Floyd County (limited central water) • Eco-tourism sites dependent on water • Damages: • Wells, springs, lakes go dry • Wildfires NRV Well Permits, July-Sept, 2002

  25. DROUGHT: Mitigation • EXISTING • Growth management tools: zoning, storm • B’burg Zoning to protect groundwater recharge • VA Emergency Declaration; new water planning requirements • USDA alternative water source program

  26. DROUGHT: Mitigation OTHER MITIGATION • Conservation programs • Education • Low-use appliances • Protect Groundwater, esp. recharge • Agricultural techniques • Forest Conservation • Stormwater management: low-impact development • Alternative water supplies • Improve efficiency storage and transport • Additional public sources • Interconnecting, creating regional system • Rain catchment systems • Alternative sources for agriculture needs • Contingency plans

  27. WILDFIRE WORST (Recent) CASEs: Date: From January to Mid-Oct, 2002, Severity: 1,629 wildfires that burned 13,195 acres Location:Virginia Damages: Impact to wildlife, watersheds, threatens homes April 16-19, 2003 142 AC on Draper Mtn; 100 AC on Poor Mountain

  28. WILDFIRE: Risks • FREQUENCY:Drought, other weather factors, (such as lightning, wind, temperature, relative humidity and atmospheric stability) SEE INDEX • Human activity • It’s not a matter of if but when wildfires of the [massive] magnitude . . Will occur in the Southern Appalachians where our forests are less open and fuels are far greater. . . Adding to building up is Southern pine beetle outbreak and hemlock woolly adelgid” A Univ. of TN fire ecologist warned, July 8, 2002

  29. WILDFIRE: Risks • SPECIAL HAZARD AREAS: • Intrusion of residential development into woodland • Based on Slope and Fuels: • Giles County: 76% woodland • Giles, Montgomery, Pulaski and Radford: steeply sloped (generally 20%+) • Logging, sawmill, or tire piles Photo by US Forest Service Hot Shots

  30. WILDFIRE: Risks • SPECIAL HAZARD AREAS (cont’d): • Brush Mountain in Montgomery Co; • Slate Mountain in Floyd Co. • Camp Powhatan in Pulaski Co. Brush Mountain Brush Mountain Slate Mountain

  31. WILDFIRE: Mitigation EXISTING VA Forestry Smokey the Bear, Fire Risk Index, Burn laws, Dry Hydrant and cross-training fire-fighting New River Highlands RC&D Woodland home/mitigation demo site(s) Firewise/VA Forestry resources available for home-builders, home-buyers, government officials Federal Wildland Fire Policy, US Forest Service community initiatives

  32. WILDFIRE: Mitigation OTHER MITIGATION: Zoning, Subdivision Ord.’s • Slope (where we build) • Level if possible, or 30 set back • Fuel (building design, material, maintenance, and landscaping) Roof & exterior walls: fire resistive materials Keep flammable vegetation, wood piles, and debris away from the walls. Screen your chimneys, exterior attic and underfloor vents with noncombustible wire mesh screening, no larger than 1/2 inch Eliminate ladder fuels and keep Trees and shrubs 30 feet from large windows • Create fire breaks/ defensible open space

  33. WILDFIRE: Mitigation OTHER MITIGATION • Involve Forester in Subdivision plat review • Fire-fighting (access and resources) • Educate home-builders and home-buyers • Additional dry-hydrants • Adequate water resources

  34. EARTHQUAKE: Risks SPECIAL HAZARD AREA: 30 km around Pearisburg (Dr. Chapman)—not surface faults POTENTIAL IMPACT: Old brick or block construction (most deaths and injuries from structures) Fire house doors and hospital equipment rendered inoperable

  35. EARTHQUAKE: Mitigation EXISTING MITIGATION: Virginia Building Code International Building Code; more stringent in building strength/flexibility; 1 in 2,500-year event MITIGATION OPPORTUNITIES: Be aware of high danger areas: such as gas pipelines near dense population Be sure that new hospitals and firehouses are properly designed “Seismic strengthening/flexibility” of critical facilities Beware deep soils in risk areas, particularly with bridges

  36. NRV Plan Mission: • Minimize the loss of life and property caused by natural hazards by focusing on likely events, high-risk areas, and cost-effective mitigation opportunities.

  37. Lessons Learned: Challenges • Newness: lack of knowledge & guidance • Timing and Coordination: little benefit of centralized resources • Lack of Data: Infrastructure and Past Damage • Variety of Input Needed (i.e. Pembroke) • Language Barriers (i.e. 100-year flood) • Tools needed (HAZUS, and risk terminology for non-floods) • Priorities and Opportunities (concrete benefit?, post-disaster by other Fed’s)

  38. Successes • Variety of Input: informative, hopeful, real • Local gov’t managers, planners, building officials, zoning officials, emergency personnel • Citizens groups, Amer. Red Cross, RAAP, Rainwater Harvesting, Inc. • State and Fed agencies, including Virginia Tech

  39. Successes • Data to Information: • Past weather events • Flood maps and tax parcel • Well replacement points mapped in FC • New Processes: • VA Dept. of Health GPS/GIS

  40. NRV MITIGATION THEMES/GOALS • Opportunities to mitigate : • Pursue mitigation opportunities with State and Feds: which include detailed studies, acquisition, structural projects, demonstration projects • Review and update ordinances • Develop/integrate information • GIS layers: floodplains, slopes, tree cover, modeling • Educate citizens regarding hazards and mitigation, such as flood insurance, retrofitting, natural resource protection, easements • Regional Telecommunications capacity and early warning mechanisms • Consider Regional Swift Water Rescue, Damage-Assessment , Regional Water Supply

  41. NRV Hazard Mitigation Plan • www.nrvpdc.org/HazardMitigationPlan/HazardMitigationPlan.htm • Lydeana Martin lmartin@nrvdc.org, 540 639-9313

More Related