1 / 11

Embedding ILT into Planning: Chichester College's Journey

Learn about the development of ILT at Chichester College and how it became an integral part of the teaching process. Explore the challenges, projects, and future goals of ILT implementation.

Download Presentation

Embedding ILT into Planning: Chichester College's Journey

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information Learning Technology Key Strategic Objective No 4“…for ILT to become embedded into the ‘normal’ planning process associated with the Chichester Learning Model.” RSC South East Surrey / Sussex SELN Keith Burnett 11th October 2006

  2. ILT development at Chichester College – a potted history! Some examples Projects in the pipeline / challenges ILT @ Chichester College Keith Burnett 11th October 2006

  3. “Revolution”(NLN not me!) ILT to becomes embedded into the ‘normal’ teaching process NLN Transformation Model Unfettered access to ILT resources All teaching areas equipped with fixed equipment – Point, click and go! Integrated VLE (‘Chichester Online’ – Moodle Pilot) Demand for AV/MM continues to outstrip supply Transformation (College Management Change Programme) 2006 ILT concentrates on staff development and less on technical support (AV) - Barracuda! ILT joins Staff Development and new Professional Development Centre Training becomes more coordinated) ILT Champions confident and routinely share practice support CPD 57 IWBs (Aug 2006) + increase to fixed MMP (Level 1) 2005 Teacher Training: Trainers’ beginning to model the use of ILT in their practice Teacher Training: ILT introduced to new members of staff (ad hoc) ‘Sceptics to Advocates’ Addition of 15 IWBs (16Jan05) / gyromice and keyboards Evolution Addition of 18 fixed data projectors (Dec05) Demand for AV/MM often outstripping supply 2004 Indications that ILT improves results (CPS) Introduction of Portable Equipment 20 ILT Champion ‘volunteers’ established: organised and upskilling begins ILT high on the agenda (ILT a Strategic Objective initiated and supported by SMT) Keith Burnett 11th October 2006

  4. Problem! How can you explain the working components of a Cylinder Night Latch By Jason Lindsey

  5. 0 In the olden days locking mechanism technical drawings looked something like this… 2D Drawing: The Pin Tumbler Mechanism By Jason Lindsey

  6. Locks 0 By Jason Lindsey Source: www.howstuffworks.com

  7. Locks 0 By Jason Lindsey

  8. The abbreviation ILT is? A Information and Learning Technology B I Love Technology C Independent Learning Techniques D Impossible Learning Targets 0 Classroom Performance System: Voting System Anagrams I am a weakish speller William Shakespeare Animal Care CPS Science: Microscope Keith Burnett 11th October 2006

  9. Projects: Moodle ILT Training: IWB training PE Analysis / Language Lab / Specialist Software (Clicker) Challenges: Keeping up to date with new products: Kandle Software / Media Meeting demand (juggling funds) Brinsbury: Agricultural College Assistive technology & software: key skills/14+ provision Matching ILT to student expectations Correlating ILT to overall achievement (v.f.m.) Projects/Challenges.. Keith Burnett 11th October 2006

  10. Animal Care

  11. Voting Systems

More Related