BIG SUN – solar power from Nord Africa

BIG SUN – solar power from Nord Africa. PROF. DR. PETER NOVAK ENERGOTECH, LJUBLJANA SLOVENIA http://www.let-group.com/iss09/iss.nsf/ae76a4ee10890d4bc1256fb9005f74fe/cc0e39f1fed7a856c125756f0040e1e6/$FILE/BIG%20SUN%20Project%E2%80%93Solar%20power%20from%20%20North%20Africa_s.ppt.

sutton
Download Presentation

BIG SUN – solar power from Nord Africa

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BIG SUN – solar power from Nord Africa PROF. DR. PETER NOVAK ENERGOTECH, LJUBLJANA SLOVENIA http://www.let-group.com/iss09/iss.nsf/ae76a4ee10890d4bc1256fb9005f74fe/cc0e39f1fed7a856c125756f0040e1e6/$FILE/BIG%20SUN%20Project%E2%80%93Solar%20power%20from%20%20North%20Africa_s.ppt P. Novak: BIG SUN - solar power from Nord Africa

  2. ROLE OF ELECTRICITY IN SOCIETIES • ELECTRICITY is a basic final energy need for present and future societies • ELECTRICITYproduction/ consumption GROWTH in the world in last 30 years(1972 -2002) was almost linear with yearly additions of343 TWh/y or 5,6% reaching in 2002 production of 16.054 TWh/y • ELECTRICITY CONSUMPTION PRO CAPITA in 2002 in the world varies extremely and lies between 27 kWh/cap in Etiopia and 27.764 kWh/cap on Iceland (1: 1000) • World fossil fuel consumption for the electricity production grew from 20,9% to 34,3% of TPES • CO2 EMISSONS are growing at the same rate as production of electricity P. Novak: BIG SUN - solar power from Nord Africa

  3. ENERGY SYSTEM FOR SUSTAINABLEDEVELOPMENT 2 ENERGY SYSTEM FOR UN-SUSTAINABLE DEVELOPMENT EMISSIONS OF CO2: 24.101,83 Mt/y IN 2002 LIQUID FUEL LPG BIOMASS P. Novak: BIG SUN - solar power from Nord Africa

  4. ENERGY SYSTEM FOR SUSTAINABLE DEVELOPMENT EMISSIONS IN YEAR 2xxx ? 0,00 CO2 GEOTHERMAL P. Novak: BIG SUN - solar power from Nord Africa

  5. ELECTRICITY GENERATION IN EU Predicted installed capacity of differentgeneratingcapacities in 15 EU states (GW)* 2000201020202030 growth % • Nuclear136.4135.1117.245.6 - 66,5 ?? • Coal and Lignite166.1101.136.99.5 - 94,3 ?? • Open Cycle multi-fired68.760.2122.3244.6 256 • Open Cycle IPP33.12520.515.1 - 54,4 • GTCC59208.7305354.3 500,5 ?? • Small GT25.245.279.296.6 283,3 ?? • Clean Coal and Lignite0.53.426.637 7300 !!! • Biomass-Waste4.44.766.5 47,7 • Fuel Cells0001.3 --- • Hydro-Renewables119.2133.7158170.7 43,2 • TOTALS612.6717.1871.7981.2 60,2 *The Liberalisation of Europe's Electricity Markets –pg.12, 2000 P. Novak: BIG SUN - solar power from Nord Africa

  6. EU RE TARGET +87,5 New generating capacity: fossil fuel to 2010 104,5 GW* to 2030 368,6 GW* * 50 % new, 50 % replacement [1] White Paper, table 3, page 50 P. Novak: BIG SUN - solar power from Nord Africa

  7. CONVERSION TECHNOLOGIES SOLAR THERMAL ELECTRICITY • SOLAR TOWER (molten salt-sodium, potassium nitrate) ~ 900 °C • ONLY EXPERIMENTAL UNIT 10 MW • LOW EFFICIENCY ~ 7% • INVESTMENT NOT KNOWN • MAINTENANCE OF HELIOSTATS • HIGH TEMPERATURE CONVERSION USEFULL FOR SINFUEL • Project: 40 MW thermal – 15 MWe/24 h; 15$c/kWh • Investment: 100 M$ P. Novak: BIG SUN - solar power from Nord Africa

  8. CONVERSION TECHNOLOGIES SOLAR THERMAL ELECTRICITY • PARABOLIC TROUGH (thermal oil) ~400 °C • Real SEGS 354 MW – 20 year of operation • Efficiency:~ 10,8%,y; 20% dayly max. • New plant eff.:: ~ 15-16%,y • Solar field eff. up to 60% • investment: $2000/kW for SEGS • Investment: $ 850/kW for ISCCS • Maintenance: acceptable • Hybridization up to 25%, thermal storage • Thermal storage costs:~ $20/ kWh SEGS- Solar Electric Generating System ISCCS – Integrated Solar Combined-Cycle System P. Novak: BIG SUN - solar power from Nord Africa

  9. CONVERSION TECHNOLOGIESSolar chimney For medium power, simple design, reliable (?) Low efficency, integrated storage, aproppriate for hybridization with CSP, little experience P. Novak: BIG SUN - solar power from Nord Africa

  10. SOLAR THERMAL SYSTEM EFFICIENCY Basic Research Needs for solar energy utilisation, ANL Workshop April 2005 P. Novak: BIG SUN - solar power from Nord Africa

  11. Solar electricity production POSSIBILITIES in LIBYA • LAND • SOLAR IRRADIATION • AVAILABILITY OF TECHNOLOGIES • ELECTRICITY DISPATCH P. Novak: BIG SUN - solar power from Nord Africa

  12. MAP of LYBIA 1,759,540.00 sq km, 1% arable land Land for ~ 700 GW PP 200 x 200 km ~1542 km ~1667 km P. Novak: BIG SUN - solar power from Nord Africa

  13. DIREKT SOLAR IRRADIATION on the world map P. Novak: BIG SUN - solar power from Nord Africa

  14. CLIMATIC DATA FOR NORTH - EAST LIBYA YEARLY AVERAGE: Air temperature: 19,1°C Insulation on 31°tilted surface: 6,18 kWh/m2(6,6 kWh/m2 opt.) Wind speed, height 50 m: 5,01 m/s (86% > [3÷ 10] m/s) P. Novak: BIG SUN - solar power from Nord Africa

  15. PV production NORTH - EAST LIBYA YEARLY AVERAGE: Air temperature: 19,1°C Insulation on 31°tilted surface: 6,18 kWh/m2(6,6 kWh/m2 opt.) Yearly production: 1541 kWhe Land use: ~ 25 m2/ kWp P. Novak: BIG SUN - solar power from Nord Africa

  16. DESIGN CONCEPT • ESTIMATED PRODUCTION CAPACITY • EU 25 ESTIMATED ELECTRICITY CONSUMPTION IN 2010: > 3000 TWh (2711 TWh in 2002) • INVESTMENT PLAN TO 2030: 184, 3 GW FOR REPLACEMENT AND 184,3 GW NEW PP • RENEWABLE ENERGY SHEAR: 87,5 GW • In 25 years 14 744 MW PP to be build per year ! • 50 % of them can be build in SAHARA as SUSTAINABLE, POLLUTION FREE ELECTRICITY P. Novak: BIG SUN - solar power from Nord Africa

  17. DESIGN CONCEPT SOLAR THERMAL POWER and PV PLANT AREA • 1000 MW unit, consisting of: 1 x 200 MW solar chimney: 5000 x 5000 m 3 x 200 MW ISCCS: 3 x 6100 x 700 m 1 x 200 MW PV 1 x 5000 x 500 m Total land use for 1 GW plant: 6800 x 6400 m = 43, 52 km2 Total efficiency: solar chimney: 3,0 % ISCCS: 12,5% PV: 10,5% Capacity factor: 0,5 Yearly electricity production: 3,862 TWh Number of units build per year: 7 P. Novak: BIG SUN - solar power from Nord Africa

  18. 2 x 100 PV 6 x 100 MW ISCCS 1 x 200 MW SOLAR POWER STATION 1 GW + ~ 200 WIND TURBINE (~ 7X7 KM) DESIGN CONCEPT 2 x 100 MW PV 6 x 100 MW ISCCS Solar chimney 200 MW SOLAR POWER PLANT 1 GW + ~200 WG Location: 31°N;23°E; Land use:~ 7 x 7 km P. Novak, Energotech, SI P. Novak: BIG SUN - solar power from Nord Africa

  19. CONVERSION TECHNOLOGIESdesign data ISCCS 200 MW: 773,5 GWh/y, Cf = 50% 673 ha (2600 x 2600 m); A= 33,6 m2/kW h ~ 14 %, costruction time: 12 months • Solar tower 200 MW: 350 ÷400 GWh/y, Cf ~ 57% • (700 ÷ 800 GWh/y) • Land area: 1920 ha (D =5000 m, h =1000 m), • A ~ 98 m2/kWe • ~ 2 ÷ (4) %, Construction time: 34 months P. Novak: BIG SUN - solar power from Nord Africa

  20. DESIGN CONCEPT To overcome the solar intermitance a HYBRIDIZATION OF SOLAR POWER PLANT is needed. This can be done with: • FOSSIL FUEL PP • GEOTHERMAL PP • LOW SPEED WIND TURBINE • SHORT THERM SOLAR STORAGE P. Novak: BIG SUN - solar power from Nord Africa

  21. CONVERSION TECHNOLOGIES SOLAR THERMAL ELECTRICITY ISCCS – INTEGRATED SOLAR COMBINED-CYCLE SYSTEM Low pressure solar steam Variante: ORC geothermal hot rock High pressuresolar steam P. Novak: BIG SUN - solar power from Nord Africa

  22. CONCENTRATING SOLAR POWER ECONOMICS SOLAR THERMAL ELECTRICITY Debt Interest Rate: 9,5% Equity IRR: 15% Performans waranty: 1-5 y Peak capacity factor on 6h basis: 90 -95% with fossil hybrid or thermal storage Annual capacity factor: Cf ~ 40-50 % P. Novak: BIG SUN - solar power from Nord Africa

  23. CPS ECONOMICS SOLAR THERMAL POWER PLANT - ISCCS (www.energylan.sandia.gov/sunlab/overview.htlm) P. Novak: BIG SUN - solar power from Nord Africa

  24. How to start ? • With donation of the land to the one of international organization (UNESCO; UNDP; UNEP) – 99 year contrac • Organizing the international activities to build the first unit from donation and privat/public partnership • Seling the green electricity to the Europe and other interested countrie • Clean income should be used for activities of UN org. (e.g. UNESCO tc.) • Benefits: • UN organization become finantial les depended to help the African countries • Europe will be supplied with sustainable electricity from independent organization • Expirence will be collected for the next units • The next units can be commercial • Questions? • Can we find the donor? • Will the UNO accept the proposal and will be in position to realize the job P. Novak: BIG SUN - solar power from Nord Africa

  25. CONCLUSIONS The question of solar electricity production on large scale in Nord Africa is not: “Can we do it?” but “Why don’t WE?” THANK YOU P. Novak: BIG SUN - solar power from Nord Africa