310 likes | 322 Views
Long-Term Massive Production Runs on Alliance resources: Experience. Vladimir Litvin, Harvey Newman, Sergei Shevchenko Caltech CMS. Introduction.
E N D
Long-Term Massive Production Runs on Alliance resources: Experience Vladimir Litvin, Harvey Newman, Sergei Shevchenko Caltech CMS
Introduction • Caltech Higgs diphoton decay channel study is in the second stage. 10M background events with full detector simulation are being simulated, reconstructed and analyzed. • 4.5M events has been done since April 2003 • Physics results have been presented at the Les Houches conference and reported on atCMS weeks and in CMS notes. • In 2004-2005 a 50-100M run on TeraGrid Alliance facilities is planned.
CPU Usage Summary 1 SU = 1 Node Hour
Analysis Chain Production analysis chain - cmsim125 and ORCAv6 (with ObjyDB) have been used - FORTRAN part can be run everywhere - ORCA C++ part was run on Caltech pTier2 only, due to ObjyDB RH6x restrictions
Operational Issues • There is a hierarchy of operational issues • We will concentrate mainly on the lowest, infrastructure, level including clusters, network, mass storage system, social issues • Even at this level there are a lot of open issues • “3-tier architecture”
NCSA(I) NCSA Platinum Cluster Technical Summary • IBM eServer x330 thin server (dual-processor) • ECC SDRAM: 1.5GB (compute nodes) • Access nodes – 4 (8 CPU) • Compute nodes – 484 (968 CPU) • Storage nodes – 32 (64 CPU) • Intel PIII 1GHz, 256kB full-speed L2 cache (peak performance 1 Gflop) • Network Interconnect: • Access node – Gigabit Ethernet • Compute node – Myrinet 2000 • Disks: local 10GB per node and 4 NFS mounted FSs 650GB each
NCSA per day SU usage NCSA total usage NCSA Statistics
NCSA Statistics • NCSA fraction of idle (Q) and running (R) time per day
NCSA Statistics • NCSA fraction of idle (Q) and running (R) time vs number of jobs completed per day
NCSA (II) • Multiple runs should be submitted in one PBS job.Due to NCSA computing policy, PBS cannot allocate one CPU – it always allocates one NODE. The same will be on future TeraGrid • Two different tasks of two different users can ask large RAM in both tasks During one CPU allocation, second CPU is sitting idle anyway. Smaller number of allocated nodes - lower the priority of this PBS job Large number of nodes allocated per one PBS job is not good from Caltech HPSS usage point of view “Fair” maui policy is even more unfair
NCSA (III) • Job submission: #!/bin/csh #PBS -q standard #PBS -N cmsim #PBS -l nodes=4:ppn=2:prod #PBS -l walltime=12:00:00 set PBSHOST = `hostname` foreach node (`cat $PBS_NODEFILE`) if ( $node == $PBSHOST ) then $GEN_EXE<in.file>&out.file & else ( ssh -a -x -q $node "$GEN_EXE<in.file>&out.file” )& endif end wait
NCSA (IV) • Walltime limit exceeding problem • Huge LAN traffic from another computing nodes in the same segment • Job was started incorrectly • Random order of running jobs • If 100 same jobs were started, the first running job might be any job – hard to predict the chunk of already ready events • PBS MAXJOB limit was set to 50; jobs are killed by PBS when number of jobs exceeds this limit
NCSA (V) • Blocked Jobs • maui can start a job and if it fails, job will be blocked and sitting in a queue without any notification. Unblock must be done by hand asking support team to do so. There isn't any way to be notified by maui/PBS. • Accounting Problem • PBS accounting cannot calculate correctly CPU used time when ssh was used to start runs on another allocated nodes • NCSA own Sybase based accounting system is wrong as well (overestimate the CPU usage)
NCSA (VI) • NCSA custom made utility “usage” is overestimates used CPU hours • “corrected” PBS accounting is too crude for the estimation as well
Caltech pTier2 (I) • Server node: • Dell PowerEdge 4400, 2GB SDRAM • 3 RAID arrays 3TB in a total • Computing nodes: • 20 rack mounted dual CPU PIII 800MHz Intel • SDRAM: 512 MB and 133 MHz • 10GB local disk • Additional (P4) Compute Nodes • Used for official CMS Pre-Challenge Production (PCP) • Not part of the production discussed today
Caltech Tier2 (II) • Caltech Tier2 layout (PIII Nodes Only shown)
Caltech per day SU usage Caltech total SU usage Caltech Tier2 Statistics
Caltech Tier2 Ganglia monitor • Screenshot
Caltech pTier2 Statistics • Caltech Tier2 fraction of idle (Q) and running (R) time per day
Caltech pTier2 Statistics • Caltech Tier2 fraction of idle (Q) and running (R) time vs total number of jobs
Caltech pTier2 (III) • NFS related problem – high CPU load average without any real work to do. • Typical diagnostics in /var/log/messages Jul 24 06:27:38 t007 kernel: nfs: server tier2 not responding, still trying Jul 24 06:27:38 t007 last message repeated 4 times Jul 24 06:29:30 t007 kernel: nfs: task 3281 can't get a request slot Jul 24 06:42:52 t007 automount[5189]: expired /data/raid1 Jul 24 06:44:06 t007 kernel: nfs: task 3283 can't get a request slot Looks like NFS server cannot send a data on request due to overloading or other reasons and when the length of pending requests from one client starts to exceed the certain threshold
Good node (Ganglia) Bad node (Ganglia) Caltech Tier2 (IV)
Good node (Ganglia) Bad node (Ganglia) Caltech Tier2 (V)
Condor (UW-Madison) • Condor flock of chaotically distributed nodes: • Intel/Linux – 614 nodes • Intel/WinNT50 – 113 • SUN4u/Solaris28 – 105 • SUN4x/Solaris28 – 6 • We are using it for FORTRAN part only
Condor per day SU usage Condor total usage Condor (UW-Madison) Statistics
Condor (UW-Madison) • NFS problem – evicted job cannot open existed file after start on a new node • Failure rate depends on type of job and varied from <0.01% (cmkin) to 2-5% (cmsim) • Reason is unknown
Caltech HPSS • Hardware • 5SP2 four processor “Silver” nodes • 1 SP2 eight processor “High” node • IBM 3494 Robotic tape library with • 6 IBM Magstar 3590 drives (10GB per tape, 9MB/s • 2300 tape slots (23 TB capacity) • StorageTek 4410 Robotic tape silo • 4 STK Redwood drives (50GB per tape, 11MB/s) • 6000 tape slots (300TB capacity)
Caltech HPSS • Cannot keep more than 200-300 connections at the same time. 400 connections killed the whole system • Future TeraGrid Caltech Unit will have 100TB of disks under PVFS
Conclusion (I) • Alliance resources could be a great asset for the future CMS milestones like DC05, Physics and Computing TDRs, etc • Full use of such resources requires overcoming some operational problems at the outset. But we have been largely successful in dealing with such problems
Conclusion (II) • In addition to Application and Grid Middleware problems we have a set of infrastructure technical problems, policies and social open issues which can prevent fully utilize future grid capacity • Technical issues are closely connected with Computing Center policies. • PBS has a set of limitations – MAXJOB limit, finest granularity is node, not CPU, wrong sequence of running jobs
Conclusion (III) • Lack of good monitoring and accounting system. This is the basis of any future activity of resource brokers and it is practically impossible to have robust broker without detailed statistical information • Reliable Mass Storage System is the critical issue for LHC data handling. Current limitation on opened connections at Caltech HPPS is raised questions about MSS reliability. Further investigations with HPSS and PVFS are essential