60 likes | 221 Views
Construction of the factory for ferrosilicium production.
E N D
Theinvestmentprojectforeseesinvestment in new plant construction of an electricarc furnace for the production of ferroalloys power of a total of 48 MVA (2 x 24 MVA) at the Municipalityof GornjiVakuf – Uskoplje and its associated facilities: • land • facilities • electric arc furnace for reduction
All material inputs are availableon the domestic market except coal and electrode mass that would be imported. • Quartz ore would be procured from the open pit “Smrčevice“ from GornjiVakuf-Uskoplje. Chemical composition of quartz • Lignite would be procured from nearby lignite mine „Gračanica” in GornjiVakuf – Uskoplje. • Metallurgical coke will be transported from the coke plant in Zenica or Lukavac • Wood chips and iron filings would be supplied from the local market in the vicinity of the plant. MATERIAL INPUTS
The plan is designed to have a factory working 24 hours a day in four shifts. • With the realization of this production of ferrosilicium would be achieved in the amount of cca 80 tons per day, which is 29.000 tons per year. • For this project it is necessary to employed around 100 people. OPERATING EXPENSES TOTAL REVENUE
MINISTARSTVO PRIVREDE • Adresa: Stanična 43, 72270 Travnik, BIH • Telefon: +387 30 / 511-217, • Fax: +387 30 / 511-729, • e-mail: min.priv@bih.net.ba • www.sbk-ksb.gov.ba