Risk analysis – FMEA Workshops
FMEA 1 • Simple risk assessment process!! • Identifying risk • Simple method for grading risk • Determines appropriate risk reduction options • Ultimately assesses risk to patient • Applications • Equipment, facilities, products and processes • Targets areas of concern
FMEA 2 • Severity of Impact • Negligible, minor, major, critical • Occurrence of problem • Frequency • Highly unlikely, unlikely, likely, high likely • Detection of problem • Easy, can be detected, difficult to detect, undetectable
FMEA 3 RPN (Risk Priority Number) calculated RPN – numeric value to risk potential • Severity • 1-4 (1 is negligible) • Occurrence • 1-4 (1 is highly unlikely) • Detection • 1-4 (1 is easily detected) RPN = S x O x D (1-48) 1 – lowest risk to patient / highest GMP compliance