Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station & Vikas Bhawan

Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station & Vikas Bhawan. Table of Contents. Salient Project Features. Implementation plan. Present - Proposed Facilities. Financials. Deliverables - Project Benefits. Project Features. Project Features. Project Sites.

symona
Download Presentation

Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station & Vikas Bhawan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station & Vikas Bhawan

  2. Table of Contents Salient Project Features Implementation plan Present - Proposed Facilities Financials Deliverables - Project Benefits

  3. Project Features

  4. Project Features Project Sites

  5. Project Background Govt has decided to decommission IP Power Station & has earmarked 15 acres from this to the DTC – but the land with Power Dept as of now. DTC will continue to have 3 acres of land on the western side of the Ring Road, ie the DTC Depot site, even after the East West Corridor. Vikas Bhavan complex (with PWD) of 6 acres was developed in 1970s and is worn out from insides. THERE IS ADMITTED SHORTAGE OF GOVT OFFICE SPACE IN THIS AREA The concept is to redevelop all these sites in manageable sequence. Avail the entire FAR. At no cost to Govt.

  6. Project Proposal Developing an integrated office complex at the existing DTC Depot on the left over land of around 3 acres out of the 6 acres. Providing office space within the outer envelope of the existing IP Power Plant by making suitable modifications and providing facilities for bus parking in the low lying area used for coal storage for the Power Plant. Re-developing the Vikas Bhavan land to construct an integrated office complex.

  7. Project Parameters The project to be implemented by DSIIDC on a Self-Sustaining Mode at no cost to the Delhi Government The facilities and infrastructure development as per norms of MPD 2021 DSIIDC to provide the residual value of Vikas Bhawan Complex to PWD (almost Rs 5 cr). Residual value calculated @ 100% of the original cost of the buildings. The resultant infrastructure will be state of the art and serve the needs of Depts in the immediate foreseeable future. DSIIDC can generate resources for this project out of long-term/short-term leasing out of the facilities to Governmental and non-Governmental Organizations/ Corporations etc. in accordance with the land use and Master Plan stipulations.

  8. Demand for Office Space in Central Business District, Delhi MCD at the time of construction of Civic Centre assessed demand for office space from Govt. agencies. The following Govt. agencies requested space from MCD which could not be accommodated by MCD: Ministry of Finance Central Excise & Customs Life Insurance Corporation Ministry of Information Technology Ministry of Home Affairs Ministry of Agriculture Oriental Insurance Delhi Tourism Delhi Finance Commission Public Grievance Commission As may be seen from the above that there is huge demand for office space and the current project of DSIIDC could cater to a portion of the demand.

  9. Implementation Plan

  10. ProjectImplementation Plan The Power Department to vacate the Power Plant area within a year A detailed report will be got prepared by DSIIDC for the entire project (in 3 months). In next 3 months, DSIIDC to finalise agencies for modifying the interiors of the Power Plant that will provide modern office space and develop a semi-basement and open to sky bus parking for almost 600 buses. The redeveloped power plant complex will accommodate DTC Headquarters, other Govt Corporations and Bus Depot State of the Art Office Complex to be constructed at the current DTC location Government Departments currently functioning at Vikas Bhawan to be temporarily accommodated at the redeveloped current DTC depot (or at Metcalf house). Thereafter redevelopment of Vikas Bhawan Project to be taken up The entire project to be completed within five years from the date of possession of power plant site.

  11. Present vs. Proposed Facilities

  12. Present Facilities Site 1:DTC Current Status Picture showing the entrance to the bus depot Picture showing the administrative building

  13. Proposed Facilities Site 1 Proposed Facility

  14. Present Facilities Site 2:Power Plant Current Status View of the power station structure

  15. Proposed Facilities Site 2:New DTC HQ & IP Bus Depot Proposed Facility

  16. Present Facilities Site 3:Vikas Bhawan Current Status View of office buildings at Vikas Bhawan

  17. Proposed Facilities Site 3: Vikas Bhawan 2015 Proposed Facility

  18. Project Financials

  19. Total area 3 Acres Total area 12,141 SMT FSI 2 # Basement area (double basement – for cars only) 14,000 SMT Total Built Up Area 24,281 SMT Usable area 24,281 SMT Area leasable 50 % Area leasable 12,141 SMT Project Financials Total Built-up Area- Site 1: Western Side/DTC Complex

  20. Total area 15 Acres Total area 60,703 SMT FSI -- Ground floor area (for car parking) 7,284 SMT Total Built up area (internal modification) SMT Leasable area ~8,000 SMT Bus parking (semi basement + open to sky) 51,598 SMT Project Financials Total Built-up Area-Site 2: Eastern Side/Power Plant Complex ~16,000

  21. Project Financials Total Built-up Area- Site 3: Vikas Bhavan Vikas complex existing Built Up Area ~20,500 SMT Total area 5.95 Acres Total area 24,059 SMT FSI 2 # 24,000 Basement area SMT Total Built up area 48,117 SMT Area to be returned to depts ~20,000 SMT Area for commercial exploitation ~28,117 SMT

  22. Project Financials Cost Assumptions Proposed Financial Structure

  23. Project Financials Project Cost

  24. Project Deliverables and Benefits

  25. Project Deliverables Deliverables • DTC to get developed bus parking for over 600 buses (covered parking for 300 and open parking for another 300 buses) free of cost, at IP Power Plant site. • DTC to get around 8,000 sq. mtr. of built up office at, DTC IP Depot site free of cost. • DTC to get around 4,000 sq mtr of built up office space at IP Power station site free of cost. • Any increase in the DTC, IP Depot area may be adjusted on pro rata basis between DTC and DSIIDC. • All Deptts at Vikas Bhavan will get modern office with area upto existing usage free (almost 2,00,000 sft) • Remaining area will be leased out to Delhi Govt PSUs, GoI PSUs and other users at Market price. • DSIIDC will maintain the complexes for 30 yrs and charge the users at actuals. • Note: The requirements of the Transport Department/DTC will be accommodated subject to the techno- economic feasibility to be ascertained at the time of completion of Detailed Project Report.

  26. Project Benefits Optimal utilization of land / asset Green building A time bound effort by DSIIDC Access to state of art commercial office facilities Construction of bus parking ~ 600 buses Reduction in pollution levels with decommissioning of the power plant No financial impact on Govt Deptts

  27. Thank You