Importance of Relay Selection in Grid Connected Industries

Importance of Relay Selection in Grid Connected Industries<br>

Download Presentation

Importance of Relay Selection in Grid Connected Industries

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO 9001:2015 ISO 45001:2015 (OH & S) Certified Company Case Study Importance of Relay Selection in Grid Connected Industries www.systemprotection.in +91-265-2225137

  2. Justlikeallothercases, webringyouone moreactualincidenthappenedrecentlyin oneoftheProcessIndustry, connectedwith GRID (StateUtility). Inour18yearsofservice toindustries, wehavecomeacrossmany abnormalities, incidentandhaveresolved them. Evenwelearnwhilesolvingthe issuesorTrippingincidentsbutsummation ofthesemanyyearsofexperiencehas strengthenustoresolvethistypeof incidentsintime. However, thisisthefirst timewecameacrossthiskindofissue. Here under is the summary: Onalighternote, toourknowledge, mostof theabnormalities, Trippingoroperational problemsinIndustrieshappensonSunday orHolidaysonly. Keepinglegacyalive, this alsooccurredonSundayevening4PMin themonthofFeb2019. ItwasplannedshutdownfromGridsideforaddingnew33kVdistributionlinetotheir substation. Samewasinformedtoalltheconsumers2weeksinadvanceforthisshutdown whichwasscheduledfor2-3hoursincontinuation. Allgoeswellasperschedule, Powerresumedwithin2.5hoursbut…………. Connected Industriesfailedtostart. Reason….? UnhealthyVoltage. AndrelayblockedCircuitbreakersto closepertainingtoUnhealthyVoltage. Then started troubleshooting: TheycheckedPTsupply, foundhealthy. Ifduringshutdown, anymodification/sORChange/smadeinthewiring? No, everything wasasitwas. Theytookallpossiblemeasures, butwaste. Relaykeepissuingtrippingcommand. Worried about the incident, we got distressed call from user: Weenquiredwiththemandaskedwhetherallnecessarymeasureshavebeentaken. Weaskedthemtocheckinrelayconfiguration, butnotnecessarilyplantpeopleknowsit. Weevenadvisedtoreboottherelay, ifincaseitmayhavehanged. ThenweaskedRarecheck. TochangethephasesequenceofIncomingVoltagesupplyin relayforallthecombinationsasRYB, RBY, YRB, YBR, BYR, BRY. Tooursurprise!!!!! WithcombinationRBY, relaycontactgotresetandplantwasstarted. WealsoaskedthemtocheckwithotherplantconnectedtoGRIDwithsamefeedersand found: TheirMotorswererunninginReversedirectionandsamehasleadstocertainissuesrelated toprocess. Addingadditionaldowntime. Samewasissuewithotherplantsaswell. www.systemprotection.in +91-265-2225137

  3. Theproblemwasidentifiedaschangein PhasesequencemistakenlybyGRIDside duringshutdown. Weadvisedplantpeople tokeeptheoriginalwiringsothatifthis happensagaininfuturethansamecanbe identifyandrectify. Well, wegottheirappreciationasSystem ProtectionhasbeeninvolvedinSelection andRetrofittingofrelays. Iftheplanthas beenstartedwithreversedirectionmore revenuelosswouldhaveregistered. Proper Relay Selection for Equipment’s play a key role in Protecting your plant equipment in the best way. TherelaysensedthePhaseReversalas unhealthyvoltageandtherefore, wasgiving trippingcommands. Underpressure, maintenanceengineerBypassed Undervoltageprotectionandchargedthe panelashewasconcernedabout productionlost. ButwhenRelayisatfault youcan'tevenchangeordisablesetting, andthisisblessingindisguise. Wefeelsorryfortheotherindustrieswho sufferedduetoimproperrelayselection. Damagehasalreadyoccurred. Toavoidthis westronglyrecommend, whileselecting protectiverelayseitherinProjectsor retrofitting, allthepointsmustbe consideredpertainingtoprotectionand processperspective. OurteamduringannualRelaytestingin shutdown (July2018), suggestedand enabledthissetting. Just Check in your plants, what are the protections if anyhow grid power reverses? www.systemprotection.in +91-265-2225137