Report: 29-04-2019Activity: SPS aC coating + I.R. Name Wil Vollenberg Meeting
Performed activities during last 2 weeks SPS LIU aC Coating and IR ARC 3+ : (aC coating), I.R. and handling in SPS
Performed activities during last 2 weeks 181: 1 drift tube coated SPS LIU aC Coating and IR ARC 3+ : (aC coating), I.R. and handling in 867
Planned activities for next 2 weeks (18/19) SPS: • week 18: I.R. • Week 19 Re-installation ARC 3+ and dismounting 3- 867: • Week 18: I.R. + maintenance on equipment 181: • Coat 2 drift tubes (Ø 159) l = 4.5 meter
Resources distribution OK SPS tunnel: 1 Engineer / (1 Technician) / 2 FSU 867: 1 Engineer/ 1 Technician / 1 FSU (50 %) 181: 1 Engineer / 1 FSU ( 50 %)
Technical problems 1 Power-supply H.S. => repair; 2 spares available New endoscopy train under production; prototype is under testing Some connection problems with RGA’s => help from Sophie / Victoria