An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EDUCAUSE & Internet2Security Professionals ConferenceThe Challenge: Securing a Large Multicampus NetworkKirk Kelly – Pima Community CollegeScott Ferguson – Pima Community College April 11, 2006 2:45pm – 3:45pm Denver Ballroom 2 http://www.pima.edu/admin/presentations

  2. Outline http://www.pima.edu/admin/presentations • Who is Pima Community College (PCC) • PCC technology infrastructure • Specific incident • Lessons learned • New security devices • New network architecture • Questions

  3. Pima Community College Located in Tucson, AZ • 8 campuses • 9 centers Enrollment • 61,769 – Credit • 13,639 – Noncredit • 75,408 – Combined

  4. Student Profile • Average age: 27 • 41% ethnic minorities • 56% female • 69% part-time • 68% daytime • 25% evening • 7% weekends

  5. Current Data & Phone Network • 15,000 data network connections across the college • 7,000 devices connected to the network @ 100/1000mbits • Campuses, DO, and MS connected at 1 Gigabit speed via City I-Net Fiber ring • Wireless at all locations • 2,500+ phone lines across the college • Over 70 (IDF/MDF) rooms

  6. Wiring Closets, Before and After

  7. W32/Blaster Announced • August 2003 • Blaster, Nachi, Welchia • Blocked port 135, etc. at the edge • Thought antivirus updates were in place • No problems first day while others across the Internet are having major problems • Day two an infected laptop plugs in • Infection spreads quickly and network is shut down

  8. The Awakening • All services stopped • All IT meeting with the Chancellor at 6:00pm • 35+ employees worked all night • All core systems back online by 1:00pm the following day • Some remote sites offline for 2-3 days

  9. What Did We Learn? • Antivirus updates handled differently at every campus • MS patches were way behind • Firewalls & routers were underpowered and over tasked (new firewalls installed two months earlier) • No way to control or secure campus links • Network not segmented • Poor communication between command center and staff • No HVAC • No keys

  10. Desktop Antivirus and Updates • All computers centralized into two domains • McAfee ePolicy Orchestrator • WSUS for MS security updates

  11. Intrusion Detection? • Demo of an Intrusion Detection System (IDS) • Visited U of A • Discovered an IDS needs constant babysitting • Demo of an Intrusion Prevention System (IPS) • No more staff on the horizon • No central data security position or team

  12. Purchase an IPS • Decision to purchase IPS • Updates • Threat Management Center • Inline on Internet connection • Inline to all WAN links • “Wire Speed” packet inspection at gigabit speeds

  13. Firewall • Needed more horsepower • Needed firewall ports to support all WAN links • Needed more DMZs • Needed more advanced features • Purchased new firewalls • 24 gig ports • Virtual firewalls • Redundant boxes for redundant links • Processor management

  14. Changes to Network • Needed multiple DMZs to support a centralized server approach • Created a Frame Relay T1 Failover Network • Switch to gigabit • Network segmentation • Redundant Internet connection (BGP with City) • Created public access network • Wireless rides on public network

  15. Additional changes • Established a disaster recovery site • Payroll and native Banner only • Redundant Internet link • Re-architected college DNS/DHCP • From 10 distributed servers to 4 centralized • Chose an appliance solution • HA pair for internal, 1 at disaster recovery site, 1 for external DNS

  16. Future • Clean access type things….. • Patch, spyware and antivirus checking • Quarantine • Goal to provide students access and maintain security • Portal, students in LDAP • VoIP pilot and phased installation • Wireless security • Wireless with U of A and City of Tucson • Inet tie in

  17. Questions? kkelly@pima.edu sferguson@pima.edu