1 / 14

GIF++ gas systems

GIF++ gas systems. Gas supply. neutral gases : tot 9 lines Ar , CO2, N2, He, SF6, CF4 and 3 spare pipes Distribution panels: 4 gas service area + 1 preparation zone flammable gases or gases with very low vapour pressure : tot 6 lines

talia
Download Presentation

GIF++ gas systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GIF++ gas systems Ernesto, Roberto PH-DT-DI gas service

  2. Gas supply • neutral gases: tot 9 lines • Ar, CO2, N2, He, SF6, CF4 and 3 spare pipes • Distribution panels: 4 gas service area + 1 preparation zone • flammable gases or gases with very low vapour pressure: tot 6 lines • iC4H10, CH4, Ar/H2(optional), C2H2F4 and 2 spares. Lines and room heated. • Distribution panels: 1 gas service area (flammable gases) • 1 normal exhaust • 1 exhaust for potentially flammable mixtures Ernesto, Roberto PH-DT-DI gas service

  3. Gas service area • At full capacity the gas mixing zone will contain • 6 mixing racks • 3 closed loop gas systems • 2 analysis racks • 1 control rack • 5 spare racks • Gas analysis: • 1 O2 and H2O analysis rack (LHC design: automatic scan between all gas streams selected. • Gas chromatograph will be integrated in the O2-H2O analysis rack. • 1 Infrared analysis rack for monitoring iC4H10 concentration in cosmic trigger. • Hardwired interlock signal to stop the system will be send in case problem (DSS) Ernesto, Roberto PH-DT-DI gas service

  4. Gas service area • Start-up version: • 2mixing racks (cosmic and beam trigger) • 1closed loop gas systems (cosmic trigger ?) • 2 analysis racks • 1 control rack Construction procedure/design as for LHC gas systems Ernesto, Roberto PH-DT-DI gas service

  5. Gas mix distribution • • Gas mixture distribution: • Each distribution panel: 6 supply (outer diameter 8 mm) and 6 return (outer diameter 10 mm). • The gas distribution is divided in: • panels for neutral mixtures (type A) • panels for mixtures that might contain flammable gases (type B). • Gas service area • 6panels type A • 2 panels type B • Irradiation bunker • 6panels type A • 2panels type B • Preparation area • 3panels type A • 1panels type B Construction on-going Ernesto, Roberto PH-DT-DI gas service

  6. Gas mixers • Remote control and monitoring. • All info available on DIP through GCS and GppCS Ernesto, Roberto PH-DT-DI gas service

  7. Gas distribution panels Ernesto, Roberto PH-DT-DI gas service

  8. Gas service zone – final layout sup mix mix mix mix sup sup mix mix mix mix sup sup RPC1 RPC2 Spare CL1 CL2 CL3 Mix3 Mix1 Mix2 Spare IR iC4H10, R134a, SF6 Ctrl Anal Spare TGC1 Spare Spare nC5H12, CH4, CO2 Detection iC4H10 Gas supply panel neutral gases 80 cm x 40 cm x 35 cm sup Detection nC5H12 Gas supply panel flammable gases 80 cm x 40 cm x 35 cm sup Detection CH4 Mixture distribution panels 60 cm x 30 cm x 35 cm mix mix Ernesto, Roberto PH-DT-DI gas service

  9. Preparation zone– final layout sup mix mix mix mix iC4H10, nC5H12 Mobile head Mobile head Detection iC4H10 Detection nC5H12 Detection CH4 Ernesto, Roberto PH-DT-DI gas service

  10. Irradiation bunker– final layout iC4H10, nC5H12, CH4, R134a, SF6 iC4H10, nC5H12, CH4, R134a, SF6 Mobile head Mobile head TGC – nC5H12 TGC – nC5H12 Detection iC4H10 Detection nC5H12 Detection CH4 Ernesto, Roberto PH-DT-DI gas service

  11. Irradiation bunker iC4H10, nC5H12, CH4, R134a, SF6 iC4H10, nC5H12, CH4, R134a, SF6 Mobile head TGC – nC5H12 TGC – nC5H12 Detection iC4H10 Detection nC5H12 Detection CH4 Ernesto, Roberto PH-DT-DI gas service

  12. Conclusions – start-up version First version to start-up the facility: 20 distribution panels Simplified version of control rack (basic functionality like connection to remote pvss interface for recording flows, gas systems status, …) 2 gas mixing racks for the fixed installations (beam and cosmic trigger setups). Any additional mixer for users will cost about 15 kCHF (not included in the present list). 1 IR analysis rack (needed to operate cosmic trigger gas system). 1 analysis rack (O2+H2O+ gas chromatograph). 1 closed loop gas system. Ernesto, Roberto PH-DT-DI gas service

  13. Small recirculation systems • Two small systems developed: • Prototype used at GIF (2003) • New simplified version for lab R&D (2012-2014) R. Guida CERN/PH-DT-DI

  14. Gas systems – future upgrades Many possibilities for future upgrades to be discussed with users for resources: Upgrade control rack for more units (mixers, analysis, re-circulation systems, … ) Additional IR analysis rack for second mixer using flammable gas 3 mixers for users (15 kCHF each) 3 new gas recirculation systems for users Install more distribution panels (?) Ernesto, Roberto PH-DT-DI gas service