HYDRO-ELECTRIC. Forward Thinking . Product Overview. West Lafayette Wastewater Treatment Facility. Product Overview. Meter & Electrical Equipment. Meter & Electrical Equipment. 8 million gallons/day. 8MGD ~ 5,600gal/min. 5ft. Power -> 2kWh. Market Analysis.
E N D
HYDRO-ELECTRIC Forward Thinking
ProductOverview West Lafayette Wastewater Treatment Facility
ProductOverview Meter & Electrical Equipment Meter & Electrical Equipment 8 million gallons/day 8MGD ~ 5,600gal/min 5ft Power -> 2kWh
MarketAnalysis • 15% of their total budget spent on energy costs (Oregon ACWA, 2008). Energy is their biggest operational expense! • The energy captured in sewage systems is ~10 times the energy needed to treat it (WERF, 2005)
ElectricityPricing • Current Electricity costs • Indiana ~$.08 per kWh • New York ~$.14 per kWh • California ~$.15 per kWh $ 0.16/hour $0.28/hour $ .30 /hour Savings Per Unit/Hour