Preparation for Circulating Beam Beam Instrumentation 2008 Extended LTC – J-J GRAS [AB-BI]

Preparation for Circulating Beam Beam Instrumentation 2008 Extended LTC – J-J GRAS [AB-BI]. Breakdown of tests foreseen in preparation for beam Equipment folder: tests results, handling of NC, performance below specs, machine as commissioned vs. machine as specified

tallis
Download Presentation

Preparation for Circulating Beam Beam Instrumentation 2008 Extended LTC – J-J GRAS [AB-BI]

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation for Circulating BeamBeam Instrumentation 2008 Extended LTC – J-J GRAS [AB-BI] Breakdown of tests foreseen in preparation for beam Equipment folder: tests results, handling of NC, performance below specs, machine as commissioned vs. machine as specified Piquet/Experts availability

  2. Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting Access during others HWC periods Update MTF HWC of our monitors Machine Check-Out Ready for Beam

  3. Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting Access during others HWC periods Update MTF HWC of our monitors Machine Check-Out Ready for Beam

  4. LHC Monitor Installation 1/2 • LHC Beam Instrumentation consists of • Beam Position: 1182 BPM (~15 different types) • Beam Losses: ~4000 BLM (IC and SEM) • Beam Intensity: • 4 BCTDC (DC current transformer) • 4 BCTFR (fast ring current transformer) -4 BCTFD (fast dump line current transformer) • 2 BSRA (abort gap monitor) • Beam Transverse Profile: • 2 BSRT (synchrotron radiation telescope) • 2 BWS (wire scanners) • 4 BGI (ionization gas monitors), • 33 BTV (Beam TV Monitors) • Tune and Chromaticity: • 14 BPL (dedicated pick-ups) • 4 BQK (tune kickers) • 4 BQS (Schottky monitors) • Luminosity: 8 BRA (2 types) BI Readiness [JJ Gras]

  5. LHC Monitor Installation 2/2 • All monitors are installed except: • BLMs in LSS1R, 2L&R, 5L and 7L&R (i.e. 15% of the total) in progress or waiting for green light Interconnection, end of vacuum interventions). We’ll extend our Russian team contract up to May for this and rely after on CERN staff and FSU to handle the contingencies • BRAN detectors • 4 (out of 4) AB/BI CdTe detectors ready for installation • 2 (out of 4) Berkeley’s ionization chambers to be shipped in April. • These monitors are not linked to vacuum BI Readiness [JJ Gras]

  6. Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting Access during others HWC periods Update MTF HWC of our monitors Machine Check-Out Ready for Beam

  7. BI Test Procedures 1/4

  8. Procedures 2/4: EDMS LHC HW Baseline

  9. Procedures 3/4: Content Common Chapters shared by BI procedures List and description of tests per architecture layers Tests sorting per commissioning phases

  10. Procedure State 4/4 • We agreed with the HWC team and the MTF providers that we will extend these procedures, originally limited to initial HW commissioning, to • Machine check-outs, repeated each shutdowns • Commissioning with beam • Regular tests during the run (‘good as new’) • The procedures are currently reviewed to include these new tests.

  11. Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting Access during others HWC periods Update MTF HWC of our monitors Machine Check-Out Ready for Beam

  12. BI Manufacturing and Test Folders 1/3 • We use the MTF steps to log our tests result for • HW commissioning • Machine check-outs • Beam commissioning and regular test results will be kept in the operational logging DB • We also use the MTF properties to store information on layout or performance measurement performed during installation for the distributed systems BLM & BPM. These properties will be used for the initial online configuration of the monitor software and the control layout maintenance.

  13. MTF 2/3: BPM Steps

  14. MTF 3/3: BPM Properties

  15. NC Handling 1/5 • Most of the time, problems detected during installation or HWC (broken electronics, bad connectors…) are treated and fixed immediately • In some rare cases, this is not possible (i.e. non conformity on a BPM in a cryostat). In these cases, we issue a NC document via the monitor MTF in the corresponding step.

  16. NC Handling 2/5: BPM NC

  17. NC Handling 3/5: BPM NC

  18. NC Handling 4/5: BPM NC

  19. NC Handling

  20. Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting Access during others HWC periods Update MTF HWC of our monitors Machine Check-Out Ready for Beam

  21. Access Conditions 1/5

  22. Access Conditions 2/5 Free Access No Access RF Tests – No Access for Months! Restricted Access

  23. Access Conditions 3/5 • We have to • pass after inter connections (BLM/BPM in the arcs) and after bake-out in the LSS. • cope with co-activity and access conditions • co-habit with RF in point 4 where most of our individual systems are concentrated (no collimators or inj/ext kickers) • So our time is counted and we work in close collaboration with planning and HWC teams to organize our interventions

  24. Access Conditions 4/5 • We evaluated and listed all the interventions we still have to do for the HWC of our instrument. • We maintain and update this list in a file shared with planning and HWC teams • We classify intervention per sectors with the following color schema

  25. Access Conditions 4/5 • This gives:

  26. Access Conditions 5/5 • Every week, we eliminate what has been done and Valentina (Planning Team) • tells us what we can do next week • adds contingencies (interconnect re-opening, second bake out of a zone…) • warns us if access conditions change during the week • This not easy but necessary • We hope that this will become an habit for everybody in the coming weeks to avoid recent hiccups (agreed access refused once in the tunnel) • We’ll have to find some agreement with RF to get some access during their tests

  27. Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting Access during others HWC periods Update MTF HWC of our monitors Machine Check-Out Ready for Beam

  28. Beam Position Monitors • If these tests are successful, the system will be ok for machine check out and the only things left to do with beam should then be • the polarity checks • the fast timing set up of all BPMs. • All electronics cards (tunnel & surface) are first passed through a test bench where parameters of relevance for nonlinearity correction are stored in MTF. • The full cabling & BPM chain (small coax, cryofeedthough, cryo-cables, button feedthrough) is tested during HWC for non conformities. Some 14 NC (out of all interconnects) have so far been created, of which we have managed to bring approx half back into tolerance by changing the components - the others are still marked as NCs. The origin of these NCs are all slightly different (cryocables not firmly connected, overtightening of cryo-flange connections, damaged cryo cables), but half of them were found in sector 6-7, and all had passed a similar test in SMI2. • BPM mapping checks are systematically performed after installation (i.e. ~80% of LHC system is already verified for this). • Finally, Sputnik tests allow full commissioning of FIFO acquisition mode, which will be used for beam threading

  29. Beam Loss Mon. • All electronics cards (tunnel & surface) are first passed through a test bench where parameters of relevance are stored in MTF. • The full cabling & BLM chain is tested during HWC. • The ‘HV modulation’ and ‘acquisition via test signals’ together should check every channel response and correct mapping. • The test via RA source seems nevertheless necessary for this critical system. This second check of functioning and configuration of the system will reduce the errors. We have at many locations a mounting and dismounting of monitors, which potentially increases the risk of making mistakes that would make the diagnostic and tuning with beam of the system even more difficult. If these tests are successful, the BLM system should be ready for machine check-out and beam commissioning

  30. Beam TV Monitors • - 31 cameras (out of 33) are installed and aligned - 31 associated electronics are installed • The 31 systems have passed the hardware commissioning tests (steps defined for MTF) 'locally' and throught the VME systems (BTV cards with VME acces CTRL). • Everything is up to date in MTF. • The 2 remaining systems are waiting for machine installation progress (point 8: back-out to be redone week 13 and point 2: back-out week 14(?)) BTV systems should be ready for machine check-out and profile measurements

  31. Wire Scanners • Mechanicsand detector installation in the tunnel are doneon right side and in progress on leftside, including local test. • US45 electronics installation willfollowbefore the end of March allowing full acquisition chainchecks. If these tests are successful, the BWS system will be ready for machine check-out and profile measurements in the ‘bunch averaging’ mode. Bunch by bunch profile acquisition will require fast timing tuning.

  32. Synchrotron Light Telescopes • BSRT RA43 (beam 2) In place, currently in HWC, to be followed by Cold check week 14 • BSRT  RA47 (beam 1) In place , HWC starts with access in week 12, cold check week 19 • Then the Video acquisition will be ready, calibrated to the test target, all data transmissions checked as far as CCC, and left running with a test target during the following cool down. • The fast cameras will also be fitted (even before the intensifiers are available) to enable run time load and data transmission tests in the HWC and machine checkout phases. The intensifiers will be fitted during a short access to be defined in May/June (TDB with RF). After machine check out, the BSRTs will be ready for initial beam commissioning (apart from "just before beam" access). "just before beam" is a 1 hour access needed to set the hardware from target to machine light.

  33. Ionization Gas Monitors • HWC of the warm magnet have been done. They are ready for machine check out once theiroperational mode willbeagreed. • The camera, optics and tunnel electronics plus the US45 electronicswillbeinstalled by the end of the monthallowing acquisition and control chainchecks. • We’llmostprobablyneed a local pressure bump to see 2008 lowintensitybeams. The original design to injectgasagreedwith AT/VAC isnowconsideredrisky by AT/VAC whowouldlike to investigateother options. The current agreement isthattheywillinstallwhathas been foreseen but that injection willonlybeusedon dedicated MD and not on standard routines BGIs will be ready for machine check out beginning of April but most commissioning with beam issues will be linked to the available gas injection system.

  34. Beam Current Transformers • Tunel and alcoveelectronicwillbeready for HWC on week 18. • Several diagnostic and simulation units are foreseen to test the calibration procedures Thesesystemswillbeavailable for machine checkoutfrom 4-5 cool-down onwards (~ week 21) Bothshouldthenbeready for beamexpecthigh band width acquisition mode of the fastBCTs (bunch by bunch acquisition, dump line) whichwillrequirefast timing tuning.

  35. Luminosity Monitors • BRANB Pt 2&8 ; BI MonitorsThe electronics installations will be finished for the end of March. We will then remove detectors and re-installed as late as possible since they are not necessary during the HWC and machine check out phases and would not survive an un-announced bake-out. • BRANA Pt 1&5 ; Berkeley Monitors • 2/4 chambers installed: one has a dead quadrant and both need modifications (do not stand the nominal High Voltage) • Two more chambers are expected some time in April, • No electronics installed as none exists yet. Our feeling is that it will at best be "just in time". • BI envisage to install temporary scintillators/PMT systems as plan B in case something goes wrong with the ICs. • If these tests are successful, these monitors willbeready for machine check out in April and the followingtuningwillbeleft for beam • fast timing and coincidencesynchronisation • threshold scans • background evaluation… If we manage to install and HWC these monitors in time , commissioning with beam will be as for BRANA

  36. A word on ‘global’ Tests • EMC • Local effect of • Kickers in Pt 6 (extraction), 2 and 8 (injection), 4 (tune and aperture) • RF in Pt 4 • Collimation motorization in point 3 and 7 • On our instrumentation (Pick-Ups, BLM, BTV and BCTs) will be tested in collaboration with the concerned AB groups. • UPS infrastructure • BI has INB critical systems (BPM, BLM and BCTs) under UPS to ensure that Post-Mortem buffers are retrieved and stored even during a major power cut. Should we check that nothing has been forgotten along the whole acquisition line?

  37. Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting Access during others HWC periods Update MTF HWC of our monitors Machine Check-Out Ready for Beam

  38. Machine Check Out • Once HWC is ok, we can start machine check out of an instrument in order to • Check its integration in the control system • Check its functionality • Debug it as much as we can before beam • Have people involved (‘commissioners’ from OP/ABP) knowing and 'owning' the systems.

  39. Machine Check Out RBAC implementation will start when the configuration tools will be ready 2 dedicated test servers are in place to assess our logging needs before migration to operational servers Test of the software public interface agreed with OP/ABP • We will base this activity on the summary dashboard on our Wiki Web. Testing processes introduced in the LHC sequencer to regularly (ie before each fill) check the status of our instruments Fixed Displays and Graphical User Interfaces

  40. Machine Check Out • The BI SW responsible of the instrument will organize the continuous assessment of its instruments, ie: • find/organize time slots, also outside official dry runs, where conditions allowing to test a (or several) box of the dashboard are met. • Invite the instrument team members to test the box together or by sub-groups depending of the case • maintain the dashboard info up to date (color scheme and details on the box dedicated page) and prepare battle field for the next iteration •  We’ll also prepare a sequence of events (injection, BLM/BPM/BSRT/BQ measurements, start of ramp, beam dumped,...) and ask Mike to play it for us regularly outside dedicated dry runs. Like this, we should be able to progress between the ooficial dry runs.

  41. Machine Check Out • In addition to this, we will also participate to the LSA dry runs. This dashboard should help the organiser to know what they can use • The details of this approach will be discussed next week during LHCCWG and we hope to be able to launch this activity during the second half of March on several individual systems • Finally, AB/BI do not see the need today to have a piquet service during the HWC and machine check-out period and will organize these tests during normal working hours.

  42. Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting Access during others HWC periods Update MTF HWC of our monitors Machine Check-Out Ready for Beam

  43. Conclusions • BI HW commissioning for individual systems starts really now that we can. • Most of it will be finished before RF tests start again but we will need some accesses in point 4 during this period. • Distributed system HWC is in progress following installation • Machine check out will follow HWC instrument per instrument and will be done in collaboration with the OP/ABP commissioners • Then … See Rhod’s presentation tomorrow