ACCESS CONTROLS. SUMMARY. 1-Who is maintaining the ACCESS CONTROL. 2-How does the TI treat the ACCESS CONTROL problems. 3-Special Procedures. 4-Questions. SUSI. ZORA. ACCESS CONTROL SYSTEM FOR THE SI TE SU RVEILLANCE:
E N D
SUMMARY 1-Who is maintaining the ACCESS CONTROL. 2-How does the TI treat the ACCESS CONTROL problems. 3-Special Procedures. 4-Questions.
SUSI ZORA • ACCESS CONTROL SYSTEM FOR THE SITE SURVEILLANCE: • Definition, procurement, installation, testing and maintenance of controlled access systems for the site surveillance. • Maintains the production post for CERN Magnetic cards • ACCESS CONTROL SYSTEM FOR THE RADIATION ZONES: • Definition, design, installation, testing and maintenance of controlled access systems for the CERN's radiation zones. WHICH SECTION TS-CSE-AAS
ROAD UNITS BUILDINGS UNITS SHAFT UNITS (LEP/LHC) PRODUCTION CARD (B.55) SOME EXAMPLES SUSI (N.Rama)
CPS (R.Bonzano/D.Chapuis) SPS (M.Grill/R.Villard) LHC (S.Di Luca/F.Juget) CONTROLS POWER SUPPLIES ACCESS DOORS SOME EXAMPLES ZORA
MCR/PCR TI Supervision USERS Contractors ZORA EQUIPMENT OUT OF WORKING HOURS SUSI EQUIPMENT CERN’S TEAMS First-Line (TI) TROUBLESHOOTIG SEQUENCE TREATMENT
VIGILANCE Vigilance especially on ZORA Power supplies: -The couple of Charger (48Vdc) for the CPS Access located in B.354-S-403: -The Chargers and Converters for the SPS Acces located in the BAs:
ESD1*6 (B.355 – S/St6) Equipment users
SPECIAL CONSIGNS Special Consigns on some ZORA Problem Software, especially for SPS Experimental Area: -How to diagnostic & reboot software failure on the ACSEAW (Acces Server for the SPS West Area) especially for the GIF Experiment. https://edms.cern.ch/file/382799/8/GIF_acseaw.doc -How to diagnostic & reboot software failure on the IHM FactoryLink (Acces Server for the SPS North Area) - Prblem communication between NODAL & FactoryLink https://edms.cern.ch/file/491037/3/Consigne_reboot_sps2.doc