1 / 10

ACCESS CONTROLS

ACCESS CONTROLS. SUMMARY. 1-Who is maintaining the ACCESS CONTROL. 2-How does the TI treat the ACCESS CONTROL problems. 3-Special Procedures. 4-Questions. SUSI. ZORA. ACCESS CONTROL SYSTEM FOR THE SI TE SU RVEILLANCE:

Download Presentation

ACCESS CONTROLS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ACCESS CONTROLS

  2. SUMMARY 1-Who is maintaining the ACCESS CONTROL. 2-How does the TI treat the ACCESS CONTROL problems. 3-Special Procedures. 4-Questions.

  3. SUSI ZORA • ACCESS CONTROL SYSTEM FOR THE SITE SURVEILLANCE: • Definition, procurement, installation, testing and maintenance of controlled access systems for the site surveillance. • Maintains the production post for CERN Magnetic cards • ACCESS CONTROL SYSTEM FOR THE RADIATION ZONES: • Definition, design, installation, testing and maintenance of controlled access systems for the CERN's radiation zones. WHICH SECTION TS-CSE-AAS

  4. ROAD UNITS BUILDINGS UNITS SHAFT UNITS (LEP/LHC) PRODUCTION CARD (B.55) SOME EXAMPLES SUSI (N.Rama)

  5. CPS (R.Bonzano/D.Chapuis) SPS (M.Grill/R.Villard) LHC (S.Di Luca/F.Juget) CONTROLS POWER SUPPLIES ACCESS DOORS SOME EXAMPLES ZORA

  6. MCR/PCR TI Supervision USERS Contractors ZORA EQUIPMENT OUT OF WORKING HOURS SUSI EQUIPMENT CERN’S TEAMS First-Line (TI) TROUBLESHOOTIG SEQUENCE TREATMENT

  7. VIGILANCE Vigilance especially on ZORA Power supplies: -The couple of Charger (48Vdc) for the CPS Access located in B.354-S-403: -The Chargers and Converters for the SPS Acces located in the BAs:

  8. ESD1*6 (B.355 – S/St6) Equipment users

  9. SPECIAL CONSIGNS Special Consigns on some ZORA Problem Software, especially for SPS Experimental Area: -How to diagnostic & reboot software failure on the ACSEAW (Acces Server for the SPS West Area) especially for the GIF Experiment. https://edms.cern.ch/file/382799/8/GIF_acseaw.doc -How to diagnostic & reboot software failure on the IHM FactoryLink (Acces Server for the SPS North Area) - Prblem communication between NODAL & FactoryLink https://edms.cern.ch/file/491037/3/Consigne_reboot_sps2.doc

  10. - THE END -

More Related