1 / 6

Piceance Basin Natural Gas Development Program

Piceance Basin Natural Gas Development Program. Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008. Piceance Natural Gas Program Update. Two Recent Hand Injuries that Required Medical Attention 83 Wells on 4 Pads Have Been Drilled to Date

tamar
Download Presentation

Piceance Basin Natural Gas Development Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Piceance BasinNatural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008

  2. Piceance Natural Gas Program Update • Two Recent Hand Injuries that Required Medical Attention • 83 Wells on 4 Pads Have Been Drilled to Date • H&P Rig 318 Celebrated One Year Injury Free • KSI (Construction Contractor) Completed One Year Injury Free • 30 Inch Sales Pipeline Completed in August 2008 • Currently Flowing 5MMCFD • Gas is Being Processed by Enterprise • Enhanced Performance Through Technology/Process Improvements

  3. Well Design • TD – 200’ below the WF. Average TVD ~ 5,800’. • KOP – Minimum 200’ • Max Build Rate – 3o / 100’ • Max Inclination – 40o • Max Drop Rate - 2o / 100’ • Average Departure ~ 1100’. • Section 25 shown with 64, 10 acre wells hit from three pads in valley location.

  4. Piceance Natural Gas Program Update cont. • ESHIA Being Implemented into Project Management Plan • Plan Replaced Produced Water Pond with Tanks • Steadily Expanding Environmental Monitoring Programs – Water Quality and Wildlife • Finalized $25M Agreement with Garfield County for CR 204 • Granted a $45K Grant to the De Beque School District for a Computer Lab, Software and Hardware

  5. Piceance Natural Gas Program Update cont. • Partnering with the Tamarisk Coalition on the Watson Island Project • Eradication and Re-vegetation along a 70 mile stretch of the Colorado River • Major Sponsor for the Robb River Rally on Sept. 13th • A Community Biking/Running Event to Continue the Vision of Completing a Trail System Along the Colorado River from Garfield County to Utah and from Grand Junction to Delta along the Gunnison River

  6. The Future of the Piceance Program • Continue Operating the Current Two Drilling Rigs Until Mid 2010. • Continue Infrastructure Installation in the Clear Creek Valley. • Central Production Facility Commissioning Targeted for Second Quarter 2009. • Continue Interim Production Operations Until Facility Commissioning. • Limited Well Completion Activity Until Second Quarter 2009.

More Related